ObjectRight
Back to search
2660606Grantedpermission

Lisbrien, Lissenhall, Nenagh Co. Tipperary

Not open for objections: The council has already decided this application.

Proposed development

Change of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected Structure S243) and creation of openings to the new extension b) Single storey and part two-storey rear extension to the existing dwelling house c) Removal of existing derelict out-house and formation of new domestic garage d) Wastewater treatment system and all associated site works

Applicant
Not published
Authority
Tipperary County Council
Decision due
16 Aug 2026
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    22 Jun 2026

  2. Decision due

    16 Aug 2026

  3. Decision: conditional

    6 Aug 2026

  4. Grant issued

    9 Sept 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660902Awaiting decision

RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres, ii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units, iii) 4 no. electrical invertor units, iv) use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area, v) 2 no. control cabins, vi) 33kV connector cable network, joint bays and associated works, vii) Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works, viii) The decommissioning of the solar farm and reinstatement of the site at the end of its operational life - the application seeks a 10-year permission with an operational lifetime of 40 years

Lisbrien, Nenagh, Co. Tipperary Tipperary County Council Received 15 Sept 2026
25206Refused

19600111 a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works

Lisbrien, Nenagh, Co. Tipperary Tipperary County Council Received 8 Oct 2025
2560775Granted

the construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works

Barravie, Capparoe Nenagh, Co. Tipperary Tipperary County Council Received 7 Aug 2025
2360435Granted

the construction of a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works

Lisbrien, Capparoe, Nenagh Co. Tipperary Tipperary County Council Received 20 Jun 2023
2360424Awaiting decision

construction of dwelling house, garage, waste water treatment system and entrance along with all ancillary site works

Lisbrien, Capparoe, Nenagh Co Tipperary Tipperary County Council Received 18 Jun 2023
2260722Granted

a) Two new rooflights one in each gable roof hip; b) Single storey extension to the rear: Kitchen, dining, living area, WC, utility, en-suite & service store; c) Patio area to the rear and side; d) Removal of derelict outhouse & formation of a new side parking area; e) Wastewater Treatment system; f) Internal modifications to create 2 No. en-suite shower rooms at first floor and ground floor openings to the rear extension

Lisbrien, Lissenhall, Nenagh Tipperary County Council Received 19 Dec 2022