Lisbrien, Nenagh, Co. Tipperary
Proposed development
RED III the development and operation of a solar photovoltaic (PV) farm with a total site area of 6.9 hectares comprising of the following – i) construction and operation of 22,500 sqm. of solar PV arrays on ground-mounted metal frames, with a maximum overall height of 4.7 metres, ii) Internal underground trenching, electrical cabling and ducting between the solar PV arrays and electrical invertor units, iii) 4 no. electrical invertor units, iv) use and upgrading of 1 no. existing field access point for construction and operational access to the site.1 no. temporary laydown area, v) 2 no. control cabins, vi) 33kV connector cable network, joint bays and associated works, vii) Internal access track, drainage works, security fencing, CCTV, and all associated ancillary site development works, viii) The decommissioning of the solar farm and reinstatement of the site at the end of its operational life - the application seeks a 10-year permission with an operational lifetime of 40 years
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
15 Sept 2026
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (solar or wind energy) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
change of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected Structure S243) and creation of openings to the new extension b) Single storey and part two-storey rear extension to the existing dwelling house c) Removal of existing derelict out-house and formation of new domestic garage d) Wastewater treatment system and all associated site works
19600111 a solar PV panel array consisting of up to 22,500m2 of solar panels on ground mounted steel frames, 2 no. electricity control cabins, 4 no. inverter units, underground cable ducts, hard standing area, boundary security fence, site entrance, access track, landscaping, CCTV and all associated site works
the construction of a dwelling house, garage, waste water treatment system & entrance along with all ancillary site works
construction of dwelling house, garage, waste water treatment system and entrance along with all ancillary site works
a) Two new rooflights one in each gable roof hip; b) Single storey extension to the rear: Kitchen, dining, living area, WC, utility, en-suite & service store; c) Patio area to the rear and side; d) Removal of derelict outhouse & formation of a new side parking area; e) Wastewater Treatment system; f) Internal modifications to create 2 No. en-suite shower rooms at first floor and ground floor openings to the rear extension
an extension to existing dairy cow cubicle housing containing new cubicles, easy feed passages, new underground slatted tanks, calving pen and a new steel framed shed to cover new and existing cubicles and passages