Barravie, Capparoe Nenagh, Co. Tipperary
Proposed development
The construction of an entrance, dwelling house, garage, domestic waste water treatment system with polishing filter together with all associated site works
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 1 Oct 2025
- Residential units
- 1
- Floor area
- 223 m²
Timeline
Application received
7 Aug 2025
Decision due
1 Oct 2025
Decision: conditional
30 Sept 2025
Grant issued
3 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
change of house design to that granted under planning ref: 2260722 including: a) Internal modifications and upgrades to the existing dwelling house (Protected Structure S243) and creation of openings to the new extension b) Single storey and part two-storey rear extension to the existing dwelling house c) Removal of existing derelict out-house and formation of new domestic garage d) Wastewater treatment system and all associated site works
concrete slab to rear of property and PERMISSION to construct domestic storage shed on afore mentioned slab along with revised site boundaries on the ground
a domestic garage to the rear of existing dwelling house, together with all associated site works
a domestic garage to the rear of existing dwelling house together with all associated site works
a) Two new rooflights one in each gable roof hip; b) Single storey extension to the rear: Kitchen, dining, living area, WC, utility, en-suite & service store; c) Patio area to the rear and side; d) Removal of derelict outhouse & formation of a new side parking area; e) Wastewater Treatment system; f) Internal modifications to create 2 No. en-suite shower rooms at first floor and ground floor openings to the rear extension
an extension to existing dairy cow cubicle housing containing new cubicles, easy feed passages, new underground slatted tanks, calving pen and a new steel framed shed to cover new and existing cubicles and passages