MARBLE HILL, PORTNABLAGH, LETTERKENNY PO
Proposed development
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), WITH A SEPARATE DOMESTIC OFFICE AND REFLEXOLOGY STUDIO (49.1M2), WITH A GRAVELLED CURTILAGE (152.6M2), (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN TO INCLUDE AN OIL FILTER AND PREVENT WATER TO ENTER THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND WITH MAINS WATER AVAILABLE ON SITE. THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 29 Apr 2025
- Residential units
- 1
- Floor area
- 244.4 m²
Timeline
Application received
31 Jan 2025
Council asked for further information
27 Mar 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
2 Apr 2025
Decision due
29 Apr 2025
Decision: conditional
25 Apr 2025
Appeal decided: refused (ABP-322600-25)
16 Sept 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
REFURBISHMENT AND EXTENSION OF EXISTING DWELLING, INCLUDING RAISING RIDGE HEIGHT AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION CONSISTING OF A W.C. BLOCK TO THE EXISTING FUNCTION ROOM AND ALL ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), DOMESTIC OFFICE AND HOME GYM (49.1M2), WITH A CURTILAGE, GRAVELLED AREA (152.6M2). THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2, (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN INCLUDE AN OIL FILTER AND PREVENTION OF WATER ENTERING THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND. MAINS WATER IS AVAILABLE ON SITE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
DEMOLITION OF A PRE-EXISTING SERVICE BUILDING AND ERECTION OF A NEW SERVICE BUILDING INCLUDING EV CHARGING STATIONS ALONG WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
‘AS BUILT’ CONFIGURATION, SITING AND ASSOCIATED SITEWORKS OF A DWELLING HOUSE NOT CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLANS AND PARTICULARS SUBMITTED WITH THE RELEVANT PLANNING PERMISSION REF. NO. T.794/78
RAISING THE ROOF OF HOUSE AND ADDING DORMER WINDOWS TO DEVELOP FIRST FLOOR LIVING ACCOMMODATION