MARBLE HILL, PORTNABLAGH, CO. DONEGAL
Proposed development
DEMOLITION OF A PRE-EXISTING SERVICE BUILDING AND ERECTION OF A NEW SERVICE BUILDING INCLUDING EV CHARGING STATIONS ALONG WITH ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 23 Dec 2025
Timeline
Application received
29 Oct 2025
Decision due
23 Dec 2025
Decision: conditional
11 Dec 2025
Grant issued
28 Jan 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), DOMESTIC OFFICE AND HOME GYM (49.1M2), WITH A CURTILAGE, GRAVELLED AREA (152.6M2). THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2, (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN INCLUDE AN OIL FILTER AND PREVENTION OF WATER ENTERING THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND. MAINS WATER IS AVAILABLE ON SITE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
ERECTION OF A SINGLE-STOREY DWELLING HOUSE WITH AN ON-SITE WASTEWATER MANAGEMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ERECTION OF A SINGLE-STOREY DWELLING HOUSE WITH AN ON-SITE WASTEWATER MANAGEMENT SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), WITH A SEPARATE DOMESTIC OFFICE AND REFLEXOLOGY STUDIO (49.1M2), WITH A GRAVELLED CURTILAGE (152.6M2), (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN TO INCLUDE AN OIL FILTER AND PREVENT WATER TO ENTER THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND WITH MAINS WATER AVAILABLE ON SITE. THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) EXTENSION TO EXISTING CARAVAN PARK TO PROVIDE 22NO. ADDITIONAL CARAVAN PITCHES AND OPEN SPACE KICK-A-BOUT AREA, (2) ALL ASSOCIATED SITE WORKS TO INCLUDE ON-SITE WASTEWATER TREATMENT SYSTEM, WASTEWATER PUMP AND RAISED TERTIARY INFILTRATION AREA, (3) PROPOSED EXTENSION OF EXISTING WATER SUPPLY NETWORK AND STORMWATER NETWORK WITH BYPASS SEPARATOR TRAP PRIOR TO DISCHARGE TO EXISTING WATER COURSE, AND (4) REMOVAL OF 2NO. CARAVAN PITCHES TO ACCOMMODATE NEW ACCESS ROAD THROUGH THE EXISTING CARAVAN PARK INCLUDING PEDESTRIAN FOOTPATH TO CONNECT TO EXISTING PLAY AREA. AN EIAR ACCOMPANIES THIS APPLICATION
CONSTRUCTION OF NEW SINGLE STOREY SIDE EXTENSION CONSISTING OF KITCHEN/ORANGERY TO THE SIDE OF EXISTING DWELLING WITH CONNECTION TO ALL EXISTING SERVICES