DUNDRUDIAN, MARBLE HILL, PORTNABLAGH
Proposed development
RAISING THE ROOF OF HOUSE AND ADDING DORMER WINDOWS TO DEVELOP FIRST FLOOR LIVING ACCOMMODATION
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 21 Oct 2025
Timeline
Application received
30 Jul 2025
Council asked for further information
11 Sept 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
24 Sept 2025
Decision due
21 Oct 2025
Decision: conditional
17 Oct 2025
Grant issued
19 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
REFURBISHMENT AND EXTENSION OF EXISTING DWELLING, INCLUDING RAISING RIDGE HEIGHT AND ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF AN EXTENSION CONSISTING OF A W.C. BLOCK TO THE EXISTING FUNCTION ROOM AND ALL ASSOCIATED SITE WORKS
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), DOMESTIC OFFICE AND HOME GYM (49.1M2), WITH A CURTILAGE, GRAVELLED AREA (152.6M2). THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2, (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN INCLUDE AN OIL FILTER AND PREVENTION OF WATER ENTERING THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND. MAINS WATER IS AVAILABLE ON SITE. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
‘AS BUILT’ CONFIGURATION, SITING AND ASSOCIATED SITEWORKS OF A DWELLING HOUSE NOT CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLANS AND PARTICULARS SUBMITTED WITH THE RELEVANT PLANNING PERMISSION REF. NO. T.794/78
(1) CONSTRUCTION OF A NEW HOUSE (244.4M2 INCLUDING BALCONY), WITH A SEPARATE DOMESTIC OFFICE AND REFLEXOLOGY STUDIO (49.1M2), WITH A GRAVELLED CURTILAGE (152.6M2), (2) INSTALLATION OF A NEW SECONDARY WASTEWATER TREATMENT SYSTEM CONSISTING OF A BIOLOGICAL AERATED FILTER TREATMENT PLANT TOGETHER WITH A TERTIARY SAND POLISHING FILTER BED OF 13.5 M2 AND (3) A STORMWATER AND DRAINAGE MANAGEMENT LAYOUT PLAN TO INCLUDE AN OIL FILTER AND PREVENT WATER TO ENTER THE POLISHING FILTER BED BEFORE IT IS DISCHARGED TO THE GROUND WITH MAINS WATER AVAILABLE ON SITE. THE TIMBER BUILDINGS ARE TO BE BUILT USING CIRCULAR HOLLOW SECTION GALVANISED COLUMNS (CHS) ON SEPARATE PAD FOUNDATIONS: 28 PADS WILL MEASURE 1M2 AND 2 PADS WILL BE 4M2. A NATURA IMPACT STATEMENT (NIS) ACCOMPANIES THIS APPLICATION
(1) DEMOLITION OF PART OF EXISTING OUTHOUSE AND (2) REFURBISHMENT AND CONSTRUCTION OF EXTENSION TO EXISTING VACANT DWELLING AND UPGRADE OF EXISTING SEPTIC TANK SYSTEM INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS