Fort Henry Business Park, Ballina, Co Tipperary
Proposed development
The construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 3 Nov 2026
Timeline
Application received
9 Sept 2026
Decision due
3 Nov 2026
Decision: conditional
30 Oct 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings
1. (i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings
construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility
a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application.
construction of a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application
decommissioning the existing wastewater treatment system and constructing a new wastewater treatment system with overground tankage up to 6.5m high with ancillary civil works such as drainage, roads, fencing and landscaping at existing facility. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application.