ObjectRight
Back to search
2461048Withdrawnpermission

Technopath Life Sciences Park, Fort Henry, Ballina Co. Tipperary

Not open for objections: This application has been withdrawn.

Proposed development

Decommissioning the existing wastewater treatment system and constructing a new wastewater treatment system with overground tankage up to 6.5m high with ancillary civil works such as drainage, roads, fencing and landscaping at existing facility. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and accompanies this application.

Applicant
Not published
Authority
Tipperary County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    6 Dec 2024

  2. Council asked for further information

    5 Feb 2025

  3. Further information received. If the council treats it as significant, a new submission period opens (check the council's file)

    24 Jul 2025

  4. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

This application has been withdrawn.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660890Awaiting decision

(i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings

Fort Henry Business Park, Ballina, Co Tipperary Tipperary County Council Received 11 Sept 2026
2660881Granted

the construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility

Fort Henry Business Park, Ballina, Co Tipperary Tipperary County Council Received 9 Sept 2026
2660866Awaiting decision

construction of an overflow car park with associated lighting and all associated works serving the existing manufacturing facility

Fort Henry Business Park, Ballina, Co Tipperary Tipperary County Council Received 4 Sept 2026
2660865Awaiting decision

1. (i) Works to the existing manufacturing production and administration building to include: (a) Construction of an extension building between the existing production and administration building and the existing warehouse building with associated ramp access, to provide for increased production and store space; (b) Provision of seven modular store units linked to; the existing production and administration building; and, the proposed extension for use ancillary to manufacturing activity; (c) Construction of goods lift to rear of the existing production and administration building; (d) Minor alterations to the existing car park layout to facilitate the proposed extension building; (ii) Works to the existing light industrial building (‘Unit 2’) to provide for; (a) extension to the rear of the building to provide for increased storage; and (b) modifications to north-west and south-west elevations of that building to provide for the replacement of roller door and pedestrian door openings; (iii) Provision of additional plant area with perimeter fencing; (iv) Provision of new surface water management infrastructure including collection of roof water and provision of on-site surface water storage with controlled discharge from that new storage to an existing surface water outfall via a proposed new headwall outlet; (v) Provision of new pedestrian gate access along roadside boundary; (vi) Proposed lighting within the site; and (vii) All associated site development works including the removal of existing temporary modular structures from the site; and 2. Retention Permission for the following works: (a) Erection of three flag poles at the entrance; and (b) Externally affixed signage on existing buildings

Fort Henry Business Park, Ballina, Co. Tipperary Tipperary County Council Received 4 Sept 2026
2660446Granted

a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application.

Fort Henry Business Park, Ballina, Co Tipperary Tipperary County Council Received 15 May 2026
2660423Awaiting decision

construction of a new wastewater treatment plant with above ground storage and treatment tanks and associated infrastructure to replace existing wastewater treatment system serving the existing manufacturing facility, including; construction of a headwall with outfall discharge point; service/access road; decommissioning of existing wastewater treatment system; and, all associated site development and decommissioning works. A Natura impact statement will be submitted to the planning authority with the application

Fort Henry Business Park, Ballina, Co Tipperary Tipperary County Council Received 11 May 2026