Glencarra Estate Fethard Road (R689), Ardgeeha Upper, Clonmel
Proposed development
Planning reference 21636 - 55 no. residential units comprising 6 no. 3-bedroom single storey houses, 16 no. 3-bedroom two storey semi-detached houses, 21 no. 2-bedroom two storey terrace houses, and 12 no. 3-bedroom two storey terrace houses. The proposed development will also include landscaped public open space with play areas (3,632 sq.m), 115 no. car parking spaces including 22 no. visitor spaces, and 16 no. cycle parking spaces in covered cycle parking stands. The primary pedestrian/cycle/vehicular access to the proposed development is provided via the existing entrance to the Glencarra and Crann Ard Estates onto the Fethard road (R689). Planning Permission is also sought for all associated site development and landscape works including retaining walls, ESB sub-station, bin stores, boundary treatment, hard and soft landscaping, and provision of foul, surface water and water services on site with connections and modifications to existing
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 15 Dec 2026
Timeline
Application received
21 Oct 2026
Decision due
15 Dec 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the existing sauna, cold bath, changing rooms, parking and all associated site works including PERMISSION to construct a foul treatment system
the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction
a development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction
(1) the construction of 35 no. houses, comprising 24 no. 3-bedroom, two-storey, semi-detached units; 9 no. 3-bedroom, two-storey, terraced units; and 2 no. 3-bedroom, single-storey, detached units with a total of 75 no. car parking spaces. (2) Landscaping, public open space and boundary treatment; (3) All ancillary site development works, including the provision of foul water, surface water and potable water services on site; bicycle parking, roads and footpaths; ESB Substation; and public lighting. (4) Vehicular access will be via Glencarra Grove with pedestrian and cycle access via Glencarra Grove, Crann Ard, and Ardgeeha Upper
the change to the front and side elevations, new signage on the building and provision of 3 no. new stand-alone signs, including all associated site development works
construction of two new dwelling houses, renovation works to the existing house, an extension to the existing house, demolition of specific existing structures as per application drawings, alterations to the existing entrance and provision of new entrances, all associated site works and ancillary facilities