Sunville House, Ardgeeha Lower, Clonmel Co. Tipperary.
Proposed development
Construction of two new dwelling houses, renovation works to the existing house, an extension to the existing house, demolition of specific existing structures as per application drawings, alterations to the existing entrance and provision of new entrances, all associated site works and ancillary facilities
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 24 May 2025
- Residential units
- 3
- Floor area
- 2070 m²
Timeline
Application received
16 Jan 2025
Council asked for further information
12 Mar 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
27 Apr 2025
Decision due
24 May 2025
Decision: conditional
23 May 2025
Grant issued
26 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
planning reference 21636 - 55 no. residential units comprising 6 no. 3-bedroom single storey houses, 16 no. 3-bedroom two storey semi-detached houses, 21 no. 2-bedroom two storey terrace houses, and 12 no. 3-bedroom two storey terrace houses. The proposed development will also include landscaped public open space with play areas (3,632 sq.m), 115 no. car parking spaces including 22 no. visitor spaces, and 16 no. cycle parking spaces in covered cycle parking stands. The primary pedestrian/cycle/vehicular access to the proposed development is provided via the existing entrance to the Glencarra and Crann Ard Estates onto the Fethard road (R689). Planning Permission is also sought for all associated site development and landscape works including retaining walls, ESB sub-station, bin stores, boundary treatment, hard and soft landscaping, and provision of foul, surface water and water services on site with connections and modifications to existing
the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction
a development which will consist of the construction of a residential development of 54 no. houses, comprising 7 no. single-storey, 3-bed detached units; 24 no. two-storey, 3-bed semi-detached units; 12 no. two-storey, 3-bed terraced units and 11 no. two-storey, 2-bed terraced units; 119 no. car parking spaces (97 no. in-curtilage spaces and 22 no. shared visitor spaces); bicycle parking; an ESB substation; refuse staging areas; landscaping; boundary treatment; public lighting and all ancillary site development works including removal of any existing foundations and structures, provisions for foul, surface water and potable water services and the upgrading of the R689 and Crann Ard junction to a signalised junction
a) erection of Sports Flood Lighting to playing pitch and training areas and b) associated site development works
a) Erection of Sports Flood Lighting to playing pitch and training areas. b) Associated site development works
the construction of a single-storey extension to the rear of the dwelling and all associated site development works