Rosegreen, Cashel, Co Tipperary
Proposed development
A) a rainwater harvesting tank and system b) retention planning permission for changes to previously granted (ref: 2460677) and partially constructed community centre which includes changes to the plans, elevations, internal layout and an increase in the footprint of the building
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- Not available
Timeline
Application received
22 Nov 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
works carried out to a portion of property and for permission to make additional alterations to rear façade to include 1 no Patio door and 1 no rooflight along with the erection of 1.8 m high privacy fence to portion of rear yard area, directly behind the existing building with 1 no access gate included into the privacy fencing and any necessary site works
a new semi covered canopy over part of the existing walkway at the GAA pitch and changes to the boundary fence
a) a rainwater harvesting tank and system and b) retention planning permission for changes to previously granted (ref: 2460677) and partially constructed community centre which includes changes to the plans, elevations, internal layout and an increase in the footprint of the building at the Community Hall and Centre
a) a rainwater harvesting tank and system and b) retention planning permission for changes to previously granted and permission to complete (ref: 2460677) partially constructed community centre which includes changes to the plans, elevations, internal layout and an increase in the footprint of the building at the Community Hall and Centre
the alterations to the front façade of portion of the property to include 2 no. windows and raised entrance door and any necessary ancillary site works to immediate frontage
(a) alterations to, and widening of, an existing field entrance, and (b) for the provision of a second field entrance, and (c) Planning Permission to carry out further modifications to both entrances including localised boundary realignment to improve sight lines