Rosegreen, Cashel, Co. Tipperary
Proposed development
(a) alterations to, and widening of, an existing field entrance, and (b) for the provision of a second field entrance, and (c) Planning Permission to carry out further modifications to both entrances including localised boundary realignment to improve sight lines
- Applicant
- Not published
- Authority
- Tipperary County Council
- Decision due
- 23 Jun 2025
Timeline
Application received
29 Apr 2025
Decision due
23 Jun 2025
Decision: conditional
20 Jun 2025
Grant issued
24 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a new semi covered canopy over part of the existing walkway at the GAA pitch and changes to the boundary fence
a) a rainwater harvesting tank and system and b) retention planning permission for changes to previously granted (ref: 2460677) and partially constructed community centre which includes changes to the plans, elevations, internal layout and an increase in the footprint of the building at the Community Hall and Centre
a) a rainwater harvesting tank and system and b) retention planning permission for changes to previously granted and permission to complete (ref: 2460677) partially constructed community centre which includes changes to the plans, elevations, internal layout and an increase in the footprint of the building at the Community Hall and Centre
a) a rainwater harvesting tank and system b) retention planning permission for changes to previously granted (ref: 2460677) and partially constructed community centre which includes changes to the plans, elevations, internal layout and an increase in the footprint of the building
the erection of lighting on existing gallop incorporating lights mounted on poles along the side of the gallop, together with all associated site development works including installation of service ducting and a generator, on lands in the townslands of
a) an extension to the existing Community Centre; b) the changes to the existing Community Centre storage area exterior; c) the changes to the internal road layout. RETENTION PERMISSION for (1) an existing extension to the storage area; (2) an existing storage shed