ObjectRight
Back to search
2560394Grantedpermission

Church Street, Clara, Co. Offaly

Not open for objections: The council has already decided this application.

Proposed development

Conversion and extend existing garage/store into a two bedroom town house. The application will also include the change of use of this property from industrial use to residential use. Also included in this application are all associated site works and connection to existing services.

Applicant
Not published
Authority
Offaly County Council
Decision due
3 Jan 2026
Residential units
1
Floor area
39 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    31 Aug 2025

  2. Council asked for further information

    22 Oct 2025

  3. Further information received. If the council treats it as significant, a new submission period opens (check the council's file)

    28 Nov 2025

  4. Decision due

    3 Jan 2026

  5. Decision: conditional

    18 Dec 2025

  6. Grant issued

    30 Jan 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660524Awaiting decision

a proposed New Two-storey Water Bottling facility to include the following; Raw Materials Store, Finished Products Store, Packing and Unpacking areas, Canteen, Clean Room/Bottling Area, Small Laboratory, various Office areas and Welfare Facilities, Loading and unloading area, Bike shed and Bin Storage Facility, Vehicular access together with all associated site development works. Retention Permission is sought for the temporary demountable pump house/shed. Retention Permission is also sought for existing commercial water borehole and all associated site works

Clashawaun, Clara, Co. Offaly Offaly County Council Received 6 Oct 2026
EX26016Awaiting decision

21/271 FOR CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW ENTRANCE AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS, CONNECTIONS TO EXISTING SERVICES AND DRAINAGE

CURRAGH ROAD, CLARA, CO. OFFALY Offaly County Council Received 2 Oct 2026
2660361Awaiting decision

a) Demolition of the existing 2 storey house b) Construction of 41 no. residential units. The residential accommodation proposed consists of 33 no houses that includes 2 no. 2.5-storey 4-bedroom detached dwellings, 6 no. 2.5-storey 4-bedroom semi-detached dwellings, 1 no. 2-storey 4-bedroom detached dwelling, 6 no. 2-storey 4-bedroom semi-detached dwellings, 8 no. 2.5-storey 3-bedroom semi-detached dwellings, 10 no. 2-storey 3-bedroom semi-detached dwellings; 1 no 3-storey Apartment Block comprising of 4 no. 1-bedroom apartments and 4 no. 2-bedroom duplex apartments; 1 no. bin and bike store serving the apartment block; and 1no. ESB substation. The proposed works will include provision of the vehicular and pedestrian access off Kilbride Way. All with associated site works, surface car parking spaces, bin and bike store, open spaces, Landscaping, boundary treatment and drainage

Kilbride Gardens, Clara, Co. Offaly Offaly County Council Received 9 Jul 2026
2660362Awaiting decision

the construction of a Terrace of 4 two-storey houses and all associated site works and services

New Road, Erry (Maryborough), Clara Co. Offaly Offaly County Council Received 9 Jul 2026
2660343Awaiting decision

construction of a Terrace of 4 two-storey houses and all associated site works and services

New Road, Erry (Maryborough), Clara Co. Offaly Offaly County Council Received 30 Jun 2026
2660230Awaiting decision

(RED 111) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

Townlands of Lehinch Kilcoursey Kilbride Aghamore Raheen and Clara, near Clara, Co. Offaly Offaly County Council Received 29 Apr 2026