CURRAGH ROAD, CLARA, CO. OFFALY
Proposed development
21/271 FOR CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW ENTRANCE AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS, CONNECTIONS TO EXISTING SERVICES AND DRAINAGE
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 26 Nov 2026
Timeline
Application received
2 Oct 2026
Decision due
26 Nov 2026
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (new house) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
new house
Construct a three bedroom dwelling with garage. The application will also include a new shared entrance and all associated site-works, boundary treatments, conn
Curragh Road, Clara, Co Offaly · refused 18 Jul 2024 · about 50 m away · 2460183
new house
TO CONSTRUCT A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW SHARED ENTRANCE AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS, CO
CURRAGH ROAD, CLARA, CO. OFFALY · refused 8 Aug 2022 · about 30 m away · 22298
new house
CONSTRUCTION OF A DWELLING HOUSE WITH A DOMESTIC GARAGE INCORPORATING A NEW SITE ENTRANCE, BOUNDARY TREATMENTS, CONNECTIONS TO EXISTING SERVICES AND DRAINAGE AN
CURRAGH ROAD, CLARA, CO. OFFALY · refused 27 Jun 2022 · about 70 m away · 21625
new house
CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW ENTRANCE AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS, CONNEC
CURRAGH ROAD, CLARA, CO. OFFALY · refused 1 Jun 2021 · about 60 m away · 21110
new house
CONSTRUCTION OF A FOUR BEDROOM DWELLING WITH GARAGE. THE APPLICATION WILL ALSO INCLUDE A NEW ENTRANCE AND ALL ASSOCIATED SITE-WORKS, BOUNDARY TREATMENTS, CONNEC
CURRAGH ROAD, CLARA, CO. OFFALY · refused 1 Jun 2021 · about 30 m away · 21111
Planning history within 750 m
a proposed New Two-storey Water Bottling facility to include the following; Raw Materials Store, Finished Products Store, Packing and Unpacking areas, Canteen, Clean Room/Bottling Area, Small Laboratory, various Office areas and Welfare Facilities, Loading and unloading area, Bike shed and Bin Storage Facility, Vehicular access together with all associated site development works. Retention Permission is sought for the temporary demountable pump house/shed. Retention Permission is also sought for existing commercial water borehole and all associated site works
(RED 111) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
(RED III) a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
RED III - for development at this site in the townlands of Lehinch, Kilcoursey, Kilbride, Aghamore, Raheen and Clara, near Clara, Co. Offaly. The development will consist of a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of an overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application. The NIS assesses both the construction and operation of the Proposed Development, as well as integral elements of the wider project infrastructure, comprising the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) which consists of the construction and operation of c. 14MW solar photovoltaic (PV) farm located off Curragh Road (L20171) in the townland of Clara, near Clara, Co. Offaly and all associated works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
a 38kV hybrid grid connection cable and is intended to connect the permitted Ballyboughlin Solar Park (Pl. Ref. 24/60338) to the existing Clara 38kV Substation. The proposed development will consist of: •The laying of a 38kV underground electrical grid connection cable (c.4.5km in length), utilising public roads, and the construction of and overhead electrical grid connection cable (c. 0.898km in length), from the existing Clara 38kV substation to the permitted Ballyboughlin Solar Park (Pl. ref. 24/60338). • The proposed development includes all associated site development and site enabling works and ancillary infrastructure, including 5 no. joint bays and 38kV underground ducting and cabling. A Natura Impact Statement (NIS) accompanies this Planning Application
construction of a single storey extension consisting of two consultant rooms onto the rear of building and all associated site works