Thomastown Demense, Rath, Birr
Proposed development
The construction of a new single-storey fitness building and all associated site works to complete the development
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 21 Apr 2025
Timeline
Application received
25 Feb 2025
Decision due
21 Apr 2025
Decision: conditional
17 Apr 2025
Grant issued
23 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
DEMOLITION OF EXISTING DWELLING HOUSE AND FUEL SHED, AND THE CONSTRUCTION OF A REPLACEMENT DWELLING COMPRISING A PART TWO-STOREY HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, SITE ENTRANCE AND ALL ANCILLARY SITE WORKS THERETO.
CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A 10 YEAR PERMISSION FOR DEVELOPMENT WHICH CONSISTS OF THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED SITE BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE FROM THE ADJOINING L7007 TO THE NORTH AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS