MULLANAFAWNIA, FIVEALLEY, BIRR CO. OFFALY
Proposed development
DEMOLITION OF EXISTING DWELLING HOUSE AND FUEL SHED, AND THE CONSTRUCTION OF A REPLACEMENT DWELLING COMPRISING A PART TWO-STOREY HOUSE, DOMESTIC GARAGE, WASTEWATER TREATMENT SYSTEM, SITE ENTRANCE AND ALL ANCILLARY SITE WORKS THERETO.
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 4 Apr 2021
- Residential units
- 1
- Floor area
- 278.4 m²
Timeline
Application received
8 Feb 2021
Decision due
4 Apr 2021
Decision: conditional
1 Apr 2021
Grant issued
18 May 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a new single-storey fitness building and all associated site works to complete the development
A 10 YEAR PERMISSION FOR DEVELOPMENT WHICH CONSISTS OF THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED SITE BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE FROM THE ADJOINING L7007 TO THE NORTH AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
ALTERATIONS TO EXISTING OFFICE/RETAIL BUILDING AT GROUND & FIRST FLOOR LEVEL AND ALTERATIONS TO EXISTING ELEVATIONS, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
(A) EXISTING EXTENSION TO THE SOUTH OF THE EXISTING SCHOOL BUILDING THAT INCLUDES A STAFF ROOM, NEW OFFICE, RESOURCE ROOM AND ALTERATIONS TO THE EXISTING ADJOINING ROOMS AND (B) PERMISSION FOR CONSTRUCTION OF A NEW SINGLE STOREY CLASSROOM EXTENSION TO THE NORTH OF THE EXISTING SCHOOL BUILDING AND ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING ALTERATIONS AND FUTURE UPGRADING OF EXISTING FOUL DRAINAGE SYSTEM