CHARLEVILLE VIEW, TULLAMORE, CO. OFFALY
Proposed development
THE DEMOLITION OF AN EXISTING SPLIT LEVEL SINGLE STOREY DWELLING AND AN OUTBUILDING, WITH THE CONSTRUCTION OF A PROPOSED SPLIT LEVEL TWO-STOREY DWELLING AND OUTBUILDING INCLUDING LANDSCAPING AND ALL ASSOCIATED SITEWORKS
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 14 Jan 2026
- Residential units
- 1
- Floor area
- 271.8 m²
Timeline
Application received
11 Nov 2025
Decision due
14 Jan 2026
Decision: conditional
13 Jan 2026
Grant issued
19 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(RED III) to Install two heat pumps and a 2000l LPG as part of a school heating decarbonisation project under a Renewable Energy Directive III (RED III) Development
(RED III) Install two heat pumps and a 2000l LPG as part of a school heating decarbonisation project under a Renewable Energy Directive III (RED III) Development
(RED III) to two heat pumps and a 2000l LPG as part of a school heating decarbonisation project at SN Naomh Brighde Bauch, Kilcruttin, Tullamore, Co. Offaly R35 N406, under a Renewable Energy Directive III (RED III) Development
A SINGLE STOREY GARDEN ROOM TO THE REAR OF THE EXISTING DWELLING, PROPOSED LANDSCAPING AND ALL ASSOCIATED SITE WORKS
THE CONVERSION OF EXISTING HOUSE FROM A SINGLE STOREY TO A TWO-STOREY DWELLING, ALTERATIONS TO EXISTING HOUSE, PROPOSED CONSTRUCTION OF A SINGLE STOREY EXTENSION TO THE SIDE AND TO THE FRONT / SIDE WITH AN ADJOINING DOMESTIC GARAGE, WIDENING OF EXISTING ENTRANCE, ALTERATIONS TO OUT-BUILDINGS AND ALL ASSOCIATED SITE WORKS
(a) the demolition of an existing garage/utility to the side and conservatory to the rear of the existing dwelling (b) the renovation of the existing property with amendments to the existing external envelope (c) amendments to the existing roof including fabric upgrade and renewable technologies (d) a single storey extension to the rear of the existing property (e) a two-storey extension to the side of the existing property (f) a single story universally accessible lobby to the front of the existing dwelling, and (g) all required service connections, site boundary improvements and site works