Charleville Road, Tullamore, Co. Offaly.
Proposed development
A SINGLE STOREY GARDEN ROOM TO THE REAR OF THE EXISTING DWELLING, PROPOSED LANDSCAPING AND ALL ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 24 Jan 2026
- Residential units
- 1
- Floor area
- 132 m²
Timeline
Application received
21 Nov 2025
Decision due
24 Jan 2026
Decision: conditional
22 Jan 2026
Grant issued
27 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the demolition of an existing shed and construction of a new residential development of 18no. dwellings, comprising of 6no. four-bedroom semi-detached units, 1no. four-bedroom detached unit, 6no. three-bedroom terraced units, 5no. two-bedroom terraced units and all associated site development works to complete to development including new site entrance from public road, alterations to the existing Spollanstown road, paths, paving, parking, bin stores, landscaped public open space, street lighting, boundary treatments, water services, foul and and storm drainage and attenuated outflow across adjacent lands to existing open drain
demolition of an existing shed and construction of a new residential development of 18no. dwellings, comprising of 6no. four-bedroom semi-detached units, 1no. four-bedroom detached unit, 6no. three-bedroom terraced units, 5no. two-bedroom terraced units and all associated site development works to complete to development including new site entrance from public road, alterations to the existing Spollanstown road, paths, paving, parking, bin stores, landscaped public open space, street lighting, boundary treatments, water services, foul and and storm drainage and attenuated outflow across adjacent lands to existing open drain.
(RED III) to Install two heat pumps and a 2000l LPG as part of a school heating decarbonisation project under a Renewable Energy Directive III (RED III) Development
(RED III) Install two heat pumps and a 2000l LPG as part of a school heating decarbonisation project under a Renewable Energy Directive III (RED III) Development
(RED III) to two heat pumps and a 2000l LPG as part of a school heating decarbonisation project at SN Naomh Brighde Bauch, Kilcruttin, Tullamore, Co. Offaly R35 N406, under a Renewable Energy Directive III (RED III) Development
(A) ALTERATIONS TO FRONT ELEVATION OF EXISTING DWELLING TO INCLUDE REDUCTION OF EXISTING LARGE WINDOW TO SITTING ROOM AND INSTALLATION OF NEW WINDOW, INSTALLATION OF ONE NUMBER NEW WINDOW TO EXISTING ENTRANCE HALL AND ONE NUMBER NEW WINDOW TO PROPOSED STAIRWELL. (B) PERMISSION TO DEMOLISH EXISTING REAR KITCHEN EXTENSION AND REPLACE WITH NEW EXTENSION TO REAR. (C) PERMISSION FOR ATTIC CONVERSION TO EXISTING DWELLING INCLUDING INSTALLATION OF WINDOWS AT GABLE LEVEL AND VELUX ROOF WINDOWS TO FRONT AND REAR. (D) PERMISSION FOR CONSTRUCTION OF NEW BOUNDARY/ PERIMETER FENCING AND ENTRANCE GATE. (E) RETENTION PERMISSION FOR STEEL FRAME DOMESTIC GARAGE/ STORE AS CONSTRUCTED. (F) RETENTION PERMISSION FOR DOMESTIC GARAGE CONVERSION TO GRANNY FLAT/ APARTMENT AS CONSTRUCTED AND ALL ASSOICATED SITE WORKS