TINNACROSS, RATH, BIRR CO OFFALY
Proposed development
CONSTRUCTION OF A TWO STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING, INTERNAL ALTERATIONS TO ROOMS AT GROUND & FIRST FLOOR LEVEL, AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
- Applicant
- Not published
- Authority
- Offaly County Council
- Decision due
- 11 Jul 2019
- Residential units
- 1
- Floor area
- 229 m²
Timeline
Application received
1 Feb 2019
Council asked for further information
26 Mar 2019
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
23 May 2019
Decision due
11 Jul 2019
Decision: conditional
10 Jul 2019
Grant issued
15 Aug 2019
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the construction of a new single-storey fitness building and all associated site works to complete the development
A 10 YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF SOLAR PV DEVELOPMENT ON TWO SEPARATE AND DETACHED PARCELS OF LAND, PARCEL 1 IS LOCATED IN THE TOWNLAND OF CLONBEALE BEG GLEBE, RATHURE NORTH, WHILE PARCEL 2 IS LOCATED IN THE TOWNLAND OF PARKMORE. BOTH SEPARATE PARCELS WILL BE CONNECTED TO AN EXISTING PERMITTED SOLAR DEVELOPMENT UNDER PLANNING APPLICATION REF: PL20/476 BY UNDERGROUND CABLES (WILL BE SUBJECT TO A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT CONSENT APPLICATION). EACH DETACHED PARCEL CONTAINING PV PANELS WILL BE LAID OUT IN ARRAYS OVER A TOTAL DEVELOPMENT AREA OF CA. 69HA, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 24 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 2 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 2 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 2 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 12 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING AND ALL ANCILLARY WORKS. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
A 10 YEAR PERMISSION. THE DEVELOPMENT WILL CONSIST OF SOLAR PV DEVELOPMENT ON TWO SEPARATE AND DETACHED PARCELS OF LAND, PARCEL 1 IS LOCATED IN THE TOWNLAND OF CLONBEALE BEG GLEBE, RATHURE NORTH, WHILE PARCEL 2 IS LOCATED IN THE TOWNLAND OF PARKMORE. BOTH SEPARATE PARCELS WILL BE CONNECTED TO AN EXISTING PERMITTED SOLAR DEVELOPMENT UNDER PLANNING APPLICATION REF: PR20/476 BY UNDERGROUND CABLES (WILL BE SUBJECT TO A SEPARATE STRATEGIC INFRASTRUCTURE DEVELOPMENT CONSENT APPLICATION). EACH DETACHED PARCEL CONTAINING PV PANELS WILL BE LAID OUT IN ARRAYS OVER A TOTAL DEVELOPMENT AREA OF CA. 69HA, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 24 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 2 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 2 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 2 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 12 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING AND ALL ANCILLARY WORKS. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
THE INSTALLATION OF A ROOF TOP SOLAR PHOTOVOLTAIC ARRAY (2476 SQ.M) AND ASSOCIATED ELECTRICAL INFRASTRUCTURE ON EXISTING MANUFACTURING FACILITY
CONSTRUCTION OF A SINGLE STOREY DWELLING, SINGLE STOREY DOMESTIC GARAGE, BORED WELL, WASTEWATER TREATMENT SYSTEM, PERCOLATION AREA AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
A 10 YEAR PERMISSION FOR DEVELOPMENT WHICH CONSISTS OF THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 45MW COMPRISING OF CA. 105,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, THE CONSTRUCTION OF 38KV SUBSTATION (CA. 114.4M2 X 4.75 TALL), A TRANSFORMER UNIT (CA. 18M2 X 4M TALL) AND ASSOCIATED BUND (CA.55M2), ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 16 NO POWER HUBS (CA.15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 1 NO. SINGLE STOREY GRP KIOSK (3M2 X 4M), 10 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WILL BE CA. 45.2HA. A NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION