Balrath Courtyard Balrath, Navan, County Meath.
Proposed development
The development consists of the construction of new 183 sq.m. six-bedroom two storey guesthouse, new six space carpark, along with all associated site works, at Balrath Courtyard guest accommodation. The proposed guesthouse will be located entirely on the footprint of existing unused silage pit
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 23 Dec 2026
Timeline
Application received
29 Oct 2026
Last day for public submissions (est.)
Wed 2 Dec 2026
Decision due
23 Dec 2026
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development will consist of a new two-storey dwelling incorporating a family flat, along with a detached garage, a new vehicular entrance, and a septic tank with percolation area, together with all associated site development works
The development will consist of the (i) Demolition of the existing single-storey plant room on the west side of the Buttress Building (11.95m2); (ii) Remodelling of the existing Buttress Building and Coach House Building on the west side of the courtyard (145.1m2); (iii) Construction of a new single-storey entrance porch to the Buttress Building (2m2); (iv) Construction of a new rooflight on the existing roof of the Coach House Building; (v) Insertion of 7No new ‘Conservation’ rooflights on the existing roof of the Buttress Building; (vi) Construction of a single-storey extension to the west side of the Buttress Building comprising of Breakfast dining room space and kitchenette (194m2); (vii) Construction of a new west-facing terrace extending from the west side of the proposed new Breakfast room; (viii) Construction of a single storey, glazed canopy placed upon a portion of the west facing terrace to provide shelter for guests when using the proposed new west facing terrace; (ix) External goods yard to the south side of the kitchenette; (x) Construction of a new single-storey plant room in the existing Service Compound (23m2); (xi) Proposed random rubble finished stone wall cladding to the east wall of the existing Service Compound including all ancillary development and landscape works. The development will be accessed from the existing internal road network connecting to the existing ‘Ballymagarvey Village’ entrance on the R153. The works the subject of this planning application are located within the grounds of a Protected Structure (Ballymagarvey House RPS ID: 91165).
the development will consist of a new proposed two-story dwelling and detached garage, opening of a new vehicular entrance to site and septic tank and percolation area together with all associated site development works
the construction of a stable building, hay barn, a horse walker along with a new site entrance and all associated site works
construction of a rear single storey extension to existing dwelling. The extension incorporates living, dining and bedroom accommodation including alterations to existing dwelling and site works. Significant Further information/Revised plans submitted on this application.
EXTENSION OF DURATION OF PLANNING PERMISSION NA140371 - a two storey dwelling house, detached domestic garage including a new wastewater treatment system, new site entrance and all associated site works