Balrath, Navan, Co Meath
Proposed development
The construction of a stable building, hay barn, a horse walker along with a new site entrance and all associated site works
- Applicant
- Not published
- Authority
- Meath County Council
- Decision due
- 26 Jun 2022
Timeline
Application received
23 Mar 2022
Council asked for further information
16 May 2022
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
30 May 2022
Decision due
26 Jun 2022
Decision: conditional
20 Jun 2022
Grant issued
8 Aug 2022
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the development consists of the construction of new 183 sq.m. six-bedroom two storey guesthouse, new six space carpark, along with all associated site works, at Balrath Courtyard guest accommodation. The proposed guesthouse will be located entirely on the footprint of existing unused silage pit
the development will consist of the construction of a new four-bedroom, single family, one-storey house of 210sqm, and associated site and landscaping works, with access through lands owned by Ballymagarvey Village. The works the subject of this planning application are located within the grounds of a Protected Structure (Ballymagarvey House RPS MH032-127)
the development will consist of the construction of a new three bedroom, single family one-storey house of 185sqm, and associated site and landscaping works, with access through lands owned by Ballymagarvey Village. The works the subject of this planning application are located within the grounds of a Protected Structure (Ballymagarvey House RPS MH032-127)
The development will consist of the (i) Demolition of the existing single-storey plant room on the west side of the Buttress Building (11.95m2); (ii) Remodelling of the existing Buttress Building and Coach House Building on the west side of the courtyard (145.1m2); (iii) Construction of a new single-storey entrance porch to the Buttress Building (2m2); (iv) Construction of a new rooflight on the existing roof of the Coach House Building; (v) Insertion of 7No new ‘Conservation’ rooflights on the existing roof of the Buttress Building; (vi) Construction of a single-storey extension to the west side of the Buttress Building comprising of Breakfast dining room space and kitchenette (194m2); (vii) Construction of a new west-facing terrace extending from the west side of the proposed new Breakfast room; (viii) Construction of a single storey, glazed canopy placed upon a portion of the west facing terrace to provide shelter for guests when using the proposed new west facing terrace; (ix) External goods yard to the south side of the kitchenette; (x) Construction of a new single-storey plant room in the existing Service Compound (23m2); (xi) Proposed random rubble finished stone wall cladding to the east wall of the existing Service Compound including all ancillary development and landscape works. The development will be accessed from the existing internal road network connecting to the existing ‘Ballymagarvey Village’ entrance on the R153. The works the subject of this planning application are located within the grounds of a Protected Structure (Ballymagarvey House RPS ID: 91165).
the demolition of an existing sloping flat roof structure and western wall of an existing sunroom/orangery, replacement with a new hardwood timber pitched roof structure and gabled entrance façade. The work's included the provision of a new localized small kitchen by incorporating an old disused boiler house with a new window, door and staircase located to the rear elevation (north). The works also included replacement of external paving and minor associated internal alterations all within the curtilage of a Protected Structure (Ref. No. MH026-114)
single story dwelling, detached domestic garage, proprietary waste water treatment system and polishing filter. The development also includes new shared entrance with separate driveway, and all associated site works