ObjectRight
Back to search
2660034Refused on appealretention

24 Castlebrook Green, Castlebrook Manor, Castletroy Limerick

Not open for objections: The council has already decided this application.

Proposed development

A 1 bed single storey flat roof granny flat to the rear garden, and all associated site works

Applicant
Not published
Authority
Limerick City and County Council
Decision due
16 Mar 2026
Residential units
1
Floor area
28 m²
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    20 Jan 2026

  2. Decision due

    16 Mar 2026

  3. Decision: refused

    12 Mar 2026

  4. Appeal decided: refused (PL-5001129-LK-26)

    21 Jul 2026

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2661246Open · 21 days left

alterations to previously approved Planning ref no. 18/1104 (amended by 23/60258) and extended by planning reference 24/7013. The alterations will consist of modifications to the approved apartment Block 2 by omitting the ground floor creche (and associated external play area, yard and external parking) and replacement with 2 no. 2 bedroom ground floor apartments, elevational changes and all associated site works

Newtown Avenue, Newtown, Castletroy Co. Limerick Limerick City and County Council Received 30 Oct 2026
267049Awaiting decision

a residential development comprising 96 no. residential units, (16 no. semi-detached houses, 6 no. terrace houses, 2 detached units along with 2 no. 5 storey apartment blocks over basement, comprised of 72 no. apartments and basement parking), bin & bike stores, demolition of existing farm buildings, additional parallel parking along the Castletroy College road, accessed via a new entrance onto the Castletroy College road and all ancillary development works. Ancillary site development works include a new connection to the public water main, foul and surface water drainage, access roads, footpaths, vehicle parking, landscaping, boundary treatments and site development works above and below ground. The planning application is accompanied by a NIS(Natura Impact Statement). Original Planning Ref. No.'s 21/1400 and 24/60420

Newtown, Castletroy, Co. Limerick Limerick City and County Council Received 15 Oct 2026
2661145Awaiting decision

(1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and development with associated office’ use; (2) provision of; new prefabricated waste storage unit, external smoking shelter, and backup generator; (3) modification to the building elevations to include: (i) alteration to existing roof mounted mechanical services enclosure and provision of roof mounted plant; (ii) new stainless steel railing at fire escape stair; (iii) new ground floor service/access door and ancillary external access way; and (4) all ancillary site works

The National Technology Park, Plassey, Plassey Park Road Limerick Limerick City and County Council Received 2 Oct 2026
2661090Granted

new external glazing and 2no. external doors to the south-east elevation

Edward Lifesciences Industrial Campus, National Technology Park, Plassey Park Road Limerick City and County Council Received 17 Sept 2026
2661045Granted

a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

The National Technology Park, (in the townland of Rivers), Plassey Limerick Limerick City and County Council Received 8 Sept 2026
2660818Under appeal

6 no. car parking spaces and associated site works

Newtown Avenue, Castletroy, Co. Limerick Limerick City and County Council Received 17 Jul 2026