Edward Lifesciences Industrial Campus, National Technology Park, Plassey Park Road
Proposed development
New external glazing and 2no. external doors to the south-east elevation
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 11 Nov 2026
Timeline
Application received
17 Sept 2026
Decision due
11 Nov 2026
Decision: conditional
11 Nov 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
minor alterations to an existing equipment enclosure located to the rear of the main facility, to include the replacement of existing equipment, and raising of the roof by approx. 1.8 m to accommodate the new equipment, and associated site works
(1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and development with associated office’ use; (2) provision of; new prefabricated waste storage unit, external smoking shelter, and backup generator; (3) modification to the building elevations to include: (i) alteration to existing roof mounted mechanical services enclosure and provision of roof mounted plant; (ii) new stainless steel railing at fire escape stair; (iii) new ground floor service/access door and ancillary external access way; and (4) all ancillary site works
a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
a 10 Year Planning Permission for a solar farm with a total area of circa 6.2 hectares at The National Technology Park, (in the townlands of Castletroy and Rivers), Plassey, Limerick. The solar farm will consist of solar panels on ground mounted frames, 10 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 1 no. single storey spare parts container, 1 no. Ring Main Unit, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via existing entrances from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares at The National Technology Park, (in the townland of Rivers), Plassey, Limerick. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
construction of two storey detached dwelling house, detached garage, new entrance from the estate road, connection to public services together with all associated site works previously approved under planning ref.no. 20/728