11 Hawthorns, Castletroy, Co. Limerick
Proposed development
Extension of Duration for Planning Ref. 20/728: construction of two storey detached dwelling, detached garage, new entrance from the estate road, connection to public services together with all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- Not available
Timeline
Application received
6 Oct 2025
Council asked for further information
28 Nov 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a residential development comprising 96 no. residential units, (16 no. semi-detached houses, 6 no. terrace houses, 2 detached units along with 2 no. 5 storey apartment blocks over basement, comprised of 72 no. apartments and basement parking), bin & bike stores, demolition of existing farm buildings, additional parallel parking along the Castletroy College road, accessed via a new entrance onto the Castletroy College road and all ancillary development works. Ancillary site development works include a new connection to the public water main, foul and surface water drainage, access roads, footpaths, vehicle parking, landscaping, boundary treatments and site development works above and below ground. The planning application is accompanied by a NIS(Natura Impact Statement). Original Planning Ref. No.'s 21/1400 and 24/60420
(1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and development with associated office’ use; (2) provision of; new prefabricated waste storage unit, external smoking shelter, and backup generator; (3) modification to the building elevations to include: (i) alteration to existing roof mounted mechanical services enclosure and provision of roof mounted plant; (ii) new stainless steel railing at fire escape stair; (iii) new ground floor service/access door and ancillary external access way; and (4) all ancillary site works
new external glazing and 2no. external doors to the south-east elevation
a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
6 no. car parking spaces and associated site works
a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares at The National Technology Park, (in the townland of Rivers), Plassey, Limerick. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply