Mcloughlin Road National Technology Park, Plassey, Co. Limerick
Proposed development
A.) the demolition and removal of the fire damaged and structurally unstable, two storey annex measuring a total of approximately 280sqm, b.) the installation of a new bike shelter and c.) all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 10 Jan 2026
Timeline
Application received
7 Nov 2025
Decision due
10 Jan 2026
Decision: conditional
8 Jan 2026
Grant issued
11 Feb 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the erection of high level building signage to the east elevation and west elevation of Kilmurry Lodge Hotel comprising of individual lettering with an overall sign length of 5.03m and height 0.89m, illuminated by a single continuous LED strip light fitting mounted above the signage, all associated with the hotel development permitted under Planning Ref. 24/61097
new external glazing and 2no. external doors to the south-east elevation
the construction of a Columbarium wall garden within the boundary of the existing Cemetery. I. Site clearance for garden wall development II. Provision of foundations and installation Columbarium Wall Units III. Provision of paved areas from the existing cemetery footpaths IV. Landscaping, planting and seating V. Any associated drainage works
a 10 Year Planning Permission for a solar farm with a total area of circa 6.2 hectares at The National Technology Park, (in the townlands of Castletroy and Rivers), Plassey, Limerick. The solar farm will consist of solar panels on ground mounted frames, 10 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 1 no. single storey spare parts container, 1 no. Ring Main Unit, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via existing entrances from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. A Natura Impact Statement (NIS) has been prepared and will be submitted to the Planning Authority with the application. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
a single-storey flat roof extension to the side of existing dwelling to provide two additional bedrooms
(1) Demolition of an Existing Cottage (eircode V94 X0HA), (2) construction of a 3-storey staff accommodation apartment block consisting of 2no. one bed apartments and 2no. two bed apartments and ancillary bicycle store. (3) alteration to the boundary wall and all ancillary site development works