ObjectRight
Back to search
2560913Grantedpermission

Ashlawn, St. Vincents Centre, Lisnagry. Co. Limerick

Not open for objections: The council has already decided this application.

Proposed development

The conversion of an existing single storey pitched roof Low Support facility to a High Support Residential Apartment Facility comprising of 2 no. Apartments with a centralised Support Staff area. The works consist of a new single storey flat roof extension that extends to a canopy over a new entrance to the north facing elevation, new rooflights to the front, side and rear existing pitched roof, alterations throughout the existing external wall envelope in the form of removal and replacement of doors and windows and creating new openings for windows and doors, new rendered external wall insulation system, removal of existing chimney, the provision of new PV panels; including all removal works and internal alterations. External works include new boundary walls to the entire perimeter with vehicle and pedestrian access off the adjacent Avista-owned carpark to the north, hard and soft landscaping, drainage and all associated ancillary site works to Ashlawn, St. Vincents Centre Lisnagry. Co. Limerick V94P6D8 by Avista CLG. The proposal is within the curtilage of a site containing a Protected Structure but will not affect original or early structures therein

Applicant
Not published
Authority
Limerick City and County Council
Decision due
6 Nov 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    12 Sept 2025

  2. Decision due

    6 Nov 2025

  3. Decision: conditional

    6 Nov 2025

  4. Grant issued

    10 Dec 2025

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2661195Open · 6 days left

interior alterations to first floor living room to accommodate additional bedroom within existing dwelling house

7 Salmon Weir, Annacotty, Co. Limerick Limerick City and County Council Received 15 Oct 2026
2661045Granted

a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

The National Technology Park, (in the townland of Rivers), Plassey Limerick Limerick City and County Council Received 8 Sept 2026
26189Granted

installation of a ground floor window to a bedroom in the south east gable of the bungalow

Aisling Garraunykee, Lisangry, Castleconnell Co. Limerick. Limerick City and County Council Received 13 Aug 2026
2660806Refused

I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for construction stage is proposed from the Woodstown Road via the existing gateway adjacent to the junction with Mountshannon Road and existing pathway. Creation of a temporary access ramp from the eastern riverbank and temporary stone causeway (with pipes for river flow) on the downstream side of the weir to allow construction vehicle access to the weir from the eastern riverbank; the stone causeway and ramp will be removed as removal of the weir structure progresses. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds on lands approximately 50m to the east of the existing weir. IV. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and riverbank restoration works. V. All associated and ancillary site development works. VI. The planning application, including the Natura Impact Statement

Annacotty Weir on the River Mulkear, Townlands of Garraunykee and Rivers, Co. Limerick Limerick City and County Council Received 15 Jul 2026
2660771Awaiting decision

the construction of a new dwelling house with attached family flat, entrance from public road, front boundary wall, landscaping and all associated site works

Mulcair Drive, Annacotty, Co. Limerick Limerick City and County Council Received 7 Jul 2026
2660722Awaiting decision

a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares at The National Technology Park, (in the townland of Rivers), Plassey, Limerick. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply

The National Technology Park, (in the townland of Rivers), Plassey Limerick Limerick City and County Council Received 25 Jun 2026