Aisling Garraunykee, Lisangry, Castleconnell Co. Limerick.
Proposed development
Installation of a ground floor window to a bedroom in the south east gable of the bungalow
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 7 Oct 2026
Timeline
Application received
13 Aug 2026
Decision due
7 Oct 2026
Decision: conditional
7 Oct 2026
Grant issued
11 Nov 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
interior alterations to first floor living room to accommodate additional bedroom within existing dwelling house
minor alterations to an existing equipment enclosure located to the rear of the main facility, to include the replacement of existing equipment, and raising of the roof by approx. 1.8 m to accommodate the new equipment, and associated site works
(1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and development with associated office’ use; (2) provision of; new prefabricated waste storage unit, external smoking shelter, and backup generator; (3) modification to the building elevations to include: (i) alteration to existing roof mounted mechanical services enclosure and provision of roof mounted plant; (ii) new stainless steel railing at fire escape stair; (iii) new ground floor service/access door and ancillary external access way; and (4) all ancillary site works
a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for construction stage is proposed from the Woodstown Road via the existing gateway adjacent to the junction with Mountshannon Road and existing pathway. Creation of a temporary access ramp from the eastern riverbank and temporary stone causeway (with pipes for river flow) on the downstream side of the weir to allow construction vehicle access to the weir from the eastern riverbank; the stone causeway and ramp will be removed as removal of the weir structure progresses. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds on lands approximately 50m to the east of the existing weir. IV. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and riverbank restoration works. V. All associated and ancillary site development works. VI. The planning application, including the Natura Impact Statement
the construction of a new dwelling house with attached family flat, entrance from public road, front boundary wall, landscaping and all associated site works