The Rivers, Annacotty, Co. Limerick
Proposed development
The construction of 12 no. residential dwellings, comprising of 6 no. ground floor apartments and 6 no. two storey duplex houses, each with site boundaries, car parking, land scaping, site entrance, connection to existing public services and all associated site works
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- Not available
- Residential units
- 12
- Floor area
- 980.3999999999999 m²
Timeline
Application received
21 Jul 2025
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
a Large-Scale Residential development for the provision of a total of 105 no. residential units along with the provision of a creche. Particulars of the development comprise as follows: (a) Site excavation works to facilitate the proposed development to include excavation and general site preparation works. (b) The provision of a total of 46 no. 2storey residential dwellings which will consist of 33no. 3 bed units and 13no. 4 bed units. (c)The provision of a total of 59no. apartment units consisting of 2no.1 bed units and 57no.2bed units. The apartment blocks range from a height of part four storey to five storeys in height. (d) Provision of a two storey creche. (e) Provision of associated car parking at surface level via a combination of in-curtilage parking for dwellings and via on-street parking for the creche and apartment units. (f) Provision of electric vehicle charge points with associated site infrastructure ducting to provide charge points for residents throughout the site. (g) Provision of associated bicycle storage facilities at surface level throughout the site and bin storage facilities. (h) Provision of associated open space areas, residential communal open space areas to include formal play areas along with all hard and soft landscape works for private gardens and amenity spaces along with public lighting, planting and boundary treatments. (i) Provision of a new vehicular entrance and associated works along with a separate emergency vehicle access. (j) Provision of an ESB substation. (k) Internal site works and attenuation systems to include for a hydrocarbon and silt interceptors on the storm networks prior to discharge to the storm outfall pipes from the site along with provision of a wastewater foul pumping station. (l) All ancillary site development/construction works to facilitate foul, water and service networks for connection to the existing foul, water and ESB networks. A Natura Impact Statement has been prepared and accompanies this application
interior alterations to first floor living room to accommodate additional bedroom within existing dwelling house
(1) partial change of use of the building from the permitted 'advanced office' use to ‘high technology research and development with associated office’ use; (2) provision of; new prefabricated waste storage unit, external smoking shelter, and backup generator; (3) modification to the building elevations to include: (i) alteration to existing roof mounted mechanical services enclosure and provision of roof mounted plant; (ii) new stainless steel railing at fire escape stair; (iii) new ground floor service/access door and ancillary external access way; and (4) all ancillary site works
a 10 Year Planning Permission for a solar farm with a total area of circa 7.2 hectares. The solar farm will consist of solar panels on ground mounted frames, 18 no. electrical inverter stations and 1 no. single storey electrical LV/MV transformer station, 2 no. single storey spare parts containers, underground electrical ducting and cabling within the development site, security fencing, CCTV, access tracks, temporary construction compound, landscaping and all associated ancillary development and drainage works. Construction and operational vehicle access will be via an existing entrance from Plassey Park Road. The operational lifespan of the solar farm will be 25 years and planning permission is requested for this duration. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
installation of a ground floor window to a bedroom in the south east gable of the bungalow
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for construction stage is proposed from the Woodstown Road via the existing gateway adjacent to the junction with Mountshannon Road and existing pathway. Creation of a temporary access ramp from the eastern riverbank and temporary stone causeway (with pipes for river flow) on the downstream side of the weir to allow construction vehicle access to the weir from the eastern riverbank; the stone causeway and ramp will be removed as removal of the weir structure progresses. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds on lands approximately 50m to the east of the existing weir. IV. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and riverbank restoration works. V. All associated and ancillary site development works. VI. The planning application, including the Natura Impact Statement