Woodstown & Garraun, Annacotty, Co. Limerick
Proposed development
The (a) Construction of new single-storey 6-bedroom children’s respite home facility with exterior store / plantroom. (b) Site development works including landscaping, play area, new vehicular access and pedestrian access with set-down area, car parking, footpaths, water services connections and site boundaries
- Applicant
- Not published
- Authority
- Limerick City and County Council
- Decision due
- 9 Jun 2024
Timeline
Application received
15 Apr 2024
Decision due
9 Jun 2024
Decision: refused
4 Jun 2024
Appeal decided: conditional (ABP-320057-24)
20 Nov 2024
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
interior alterations to first floor living room to accommodate additional bedroom within existing dwelling house
installation of a ground floor window to a bedroom in the south east gable of the bungalow
I. The full removal (34m) of the Annacotty Weir and fish passage from the eastern riverbank up to the adjacent mill race and sluice gate at the western riverbank and making good the face of retained structural elements. II. The reprofiling and restoration of approximately 50m of the river channel to reinstate natural stream conditions and enable fish migration. This includes placement of boulders, and graded rock to replicate healthy, stable, and natural channel conditions. III. Temporary site access for construction stage is proposed from the Woodstown Road via the existing gateway adjacent to the junction with Mountshannon Road and existing pathway. Creation of a temporary access ramp from the eastern riverbank and temporary stone causeway (with pipes for river flow) on the downstream side of the weir to allow construction vehicle access to the weir from the eastern riverbank; the stone causeway and ramp will be removed as removal of the weir structure progresses. The removal of individual trees to enable construction activities. The creation of temporary construction lay down areas/site compounds on lands approximately 50m to the east of the existing weir. IV. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and riverbank restoration works. V. All associated and ancillary site development works. VI. The planning application, including the Natura Impact Statement
the construction of a new dwelling house with attached family flat, entrance from public road, front boundary wall, landscaping and all associated site works
interior alterations to first floor living room to accommodate additional bedroom within existing dwelling house
the construction of 1 no. Two storey detached dwelling house with detached garage, new boundaries and entrance, wastewater treatment system