39 Cherry Grove, Naas, Co. Kildare
Proposed development
Extension of Duration: Previous file no: 19/1421 - the conversion of an existing large single-storey double garage (c. 76sqm) to a two-storey three-bedroom detached house (No. 39A) by adding a small single-storey extension to the front (c. 7.5sqm); a single-storey extension to the rear (c. 26sqm); and a first floor addition (c. 40sqm) which will accommodate one double bedroom with an ensuite. The development includes removing an existing defunct boiler house; providing new gates for No. 39; providing new brick hardstanding for two parking spaces; and constructing a new rendered blockwork boundary wall between the two properties to match the existing boundary walls, front and back
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 14 Apr 2025
Timeline
Application received
13 Feb 2025
Decision due
14 Apr 2025
Decision: conditional
11 Apr 2025
Site location with nearby applications
Can't object to this one
This type of application (extension of duration) doesn't take public submissions.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Similar applications refused nearby
Since 2019 the council has refused these applications for the same kind of development (extension or alterations to a home) within 300 m, and they weren't overturned on appeal. They're useful planning history for your letter, and we'll suggest them when you object.
Planning history within 750 m
a two-storey extension to side of existing dwelling above existing garage which will be converted for domestic use. Single storey extension to rear of dwelling and all associated site works included
2-storey extension to Side & Ground floor extension to front of existing dwelling to contain family ancillary accommodation, with internal modifications and associated site works.
1 / 2-Storey Extension to front / side of existing extension to contain family ancillary accommodation, with internal modifications and associated site works
The development will consist of: 1. The construction of the following buildings: • a two-storey recreational / sports building containing a mix of uses (incl. pilates / yoga / dance / sauna spaces, reception, changing and refreshment facilities) with a total floor area of c. 709 m². • a single storey prefabricated padel court enclosure containing 5 double padel courts (Padel Court Building 1) with a total floor area of c. 1,554 m². • a single storey prefabricated padel court enclosure containing 2 double padel courts and 2 single padel courts (Padel Court Building 2) with a total floor area of c. 1,021 m². 2. The creation of a new vehicular entrance to the site (off an existing access road which serves Scoil Bhríde and Naas GAA). 3. The construction of access roads and footpaths within the site. 4. The provision of 67 car parking bays to serve the development including 3 no. accessible bays. 5. The provision of 60 bicycle parking spaces to serve the development. 6. The proposal also includes the provision of public open space with a total area of c. 2,313 m². 7. All ancillary site works including landscaping; boundary treatments; refuse store; and connections to the public water, stormwater and foul sewerage systems.
for the conversion of the attic to habitable space with a dormer to the south western roof, the provision of rooflights to the front and rear of the main roof and over the existing kitchen roof, minor internal and external elevational alterations, all to the existing two storey detached dwelling. Retention persmission is sought for the single storey extension to the rear, the single storey extension to the side and the window on the gable wall of the existing two storey detached dwelling.
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.