304 Morell Grove, Monread South Naas, Co. Kildare
Proposed development
Conversion of existing attic space comprising of modification of existing roof structure, new gable window, new access stairs, 2no. roof windows to the front and flat roof dormer to the rear.
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- 4 Aug 2026
Timeline
Application received
10 Jun 2026
Decision due
4 Aug 2026
Decision: conditional
4 Aug 2026
Grant issued
9 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for the change of use of 1st floor non-usable attic space to new storage space, minor internal layout arrangements to the ground floor area including provision of Accessible w.c, provision of stairs to new storage space, all within the existing industrial unit and the provision of non-illuminated signage to the front elevation of the unit and all ancillary site works.
for the change of use of Unit 3 from retail use to gym use (Class 11). The proposed development includes associated internal alterations and reconfiguration of the unit, minor alterations to the elevations including associated signage zones, provision of external cycle parking, and all associated and ancillary site development works.
for the change of use of 1st floor non-usable attic space to new storage space, minor internal layout arrangements to the ground floor area including provision of Accessible w.c, provision of stairs to new storage space, all within the existing industrial unit and the provision of non-illuminated signage to the front elevation of the unit and all ancillary site works.
The development will consist of a RED III Solar Farm (renewable energy development) on a site having a total area of approximately 6.4 hectares. The proposed development will comprise 9,240 no. photovoltaic solar modules mounted on ground-mounted support structures connected to 15 no. inverters; 1 no. single-storey electrical transformer station; 1 no. single-storey spare-parts storage container; 1 no. weather station; underground electrical ducting and cabling within the application site; security fencing and access gates; CCTV cameras; internal access tracks; a temporary construction compound; landscaping; boundary treatment; and all associated ancillary development, site development and drainage works. Construction and operational access will be provided via the existing internal access road serving the site, which connects to Monread Road through the existing signal-controlled junction serving Monread Business Park. The proposed solar farm will have an operational lifespan of 40 years from the date of commissioning. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413) and it is important to note that the planning application may be subject to section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with section 34D(b), the provisions of article 26A of the Planning and Development Regulations 2001 to 2025 shall apply.
for the development of a solar farm on a site having a total area of approximately 6.4 hectares. The proposed development will comprise 9,240 no. photovoltaic solar modules mounted on ground-mounted support structures connected to 15 no. inverters; 1 no. single-storey electrical transformer station; 1 no. single-storey spare-parts storage container; 1 no. weather station; underground electrical ducting and cabling within the application site; security fencing and access gates; CCTV cameras; internal access tracks; a temporary construction compound; landscaping; boundary treatment; and all associated ancillary development, site development and drainage works. Construction and operational access will be provided via the existing internal access road serving the site, which connects to Monread Road through the existing signal-controlled junction serving Monread Business Park. The proposed solar farm will have an operational lifespan of 40 years from the date of commissioning.
Change of use from existing retail unit to restaurant and new signage and ancillary services