25106Grantedextension of duration

Hartwell Upper, Kill, Co. Kildare

Not open for objections: This type of application (extension of duration) doesn't take public submissions.

Proposed development

For the importation of clean topsoil and subsoil in the subject site of 7.2 hectares in order that the site can be rendered suitable for planting native broadleaf forestry

Applicant
Not published
Authority
Kildare County Council
Decision due
4 Aug 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    10 Jun 2025

  2. Decision due

    4 Aug 2025

  3. Decision: conditional

    1 Aug 2025

Loading map…

Site location with nearby applications

Can't object to this one

This type of application (extension of duration) doesn't take public submissions.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660032Granted

alterations to and extension of an existing light industrial/ manufacturing facility including for an extension to the facility of c. 6,673 sq m gross floor area (resulting in a building of?c. ?15,038 sq m), as well as an increase in height of?c. 2.1m?and replacement of the roof on part of the existing facility.? The development also includes for the alteration of existing car parking on site (car parking spaces will reduce from 55 to 54 no. spaces, including for EV and disabled parking); provision of 40 no. bicycle spaces; demolition of existing structures and replacement sprinkler tank and pump house; the decommissioning of an existing on-site treatment plant and the provision of a new foul treatment plant and percolation area; SUDS measures; ?landscaping and boundaries; pedestrian paths, and all associated site development works above and below ground necessary to facilitate the construction and operation of the proposed development. Retention permission is being sought for the development of a concrete batching plant, aggregate bunker and 3 no. cement silos as built. Revised by Signification Further Information which consists of: amendments to the development’s application boundary; alterations to the proposed swales; provision of rainwater harvesting; and provision of roof mounted PV panels

Arthurstown, Kill, County Kildare Kildare County Council Received 15 Jan 2026
2574Awaiting decision

Extension of Duration: for the importation of clean topsoil and subsoil in the subject site of 7.20 hectares in order that the site can be rendered suitable for planting native broadleaf forestry. It is proposed to improve approximately 3.80 ha of the site and it is estimated that this will require approximately 128,000 cubic metres of greenfield, inert soil and stone. The applicant also proposes to install a temporary site office and canteen, wheelwash, portaloo and carry out all ancillary site works. The application relates to an activity requiring a Waste Facility Permit from the Kildare County Council. Revised by significant information consisting of; an Environmental Impact Assessment Report (EIAR) was submitted

Hartwell Upper, Kill, Co.Kildare Kildare County Council Received 11 Apr 2025
2560027Granted

for the construction of extensions to the front and sides of the existing building and all associated site development works. Revised by Significant Further Information which consists of: Additional existing temporary structures have been included on the revised Site Layout Plan

Hartwell Upper, Kill, Co. Kildare Kildare County Council Received 17 Jan 2025
2461386Awaiting decision

for the construction of extensions to the front and sides of the existing building and all associated site development works

Hartwell Upper, Kill, Co. Kildare Kildare County Council Received 20 Dec 2024
2460958Granted

for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works

Arthurstown Landfill, Kill, Co. Kildare Kildare County Council Received 27 Sept 2024
2460947Awaiting decision

for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works

Arthurstown Landfill, Kill, Co. Kildare Kildare County Council Received 25 Sept 2024