Hartwell Upper, Kill, Co. Kildare
Proposed development
For the construction of extensions to the front and sides of the existing building and all associated site development works
- Applicant
- Not published
- Authority
- Kildare County Council
- Decision due
- Not available
Timeline
Application received
20 Dec 2024
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development consists of the development as constructed including: • A self-storage facility consisting of single storey container units • Vehicular entrance • CCTV, lighting and information signage and solar panels. • Associated site works
alterations to and extension of an existing light industrial/ manufacturing facility including for an extension to the facility of c. 6,673 sq m gross floor area (resulting in a building of?c. ?15,038 sq m), as well as an increase in height of?c. 2.1m?and replacement of the roof on part of the existing facility.? The development also includes for the alteration of existing car parking on site (car parking spaces will reduce from 55 to 54 no. spaces, including for EV and disabled parking); provision of 40 no. bicycle spaces; demolition of existing structures and replacement sprinkler tank and pump house; the decommissioning of an existing on-site treatment plant and the provision of a new foul treatment plant and percolation area; SUDS measures; ?landscaping and boundaries; pedestrian paths, and all associated site development works above and below ground necessary to facilitate the construction and operation of the proposed development. Retention permission is being sought for the development of a concrete batching plant, aggregate bunker and 3 no. cement silos as built. Revised by Signification Further Information which consists of: amendments to the development’s application boundary; alterations to the proposed swales; provision of rainwater harvesting; and provision of roof mounted PV panels
for the importation of clean topsoil and subsoil in the subject site of 7.2 hectares in order that the site can be rendered suitable for planting native broadleaf forestry
Extension of Duration: for the importation of clean topsoil and subsoil in the subject site of 7.20 hectares in order that the site can be rendered suitable for planting native broadleaf forestry. It is proposed to improve approximately 3.80 ha of the site and it is estimated that this will require approximately 128,000 cubic metres of greenfield, inert soil and stone. The applicant also proposes to install a temporary site office and canteen, wheelwash, portaloo and carry out all ancillary site works. The application relates to an activity requiring a Waste Facility Permit from the Kildare County Council. Revised by significant information consisting of; an Environmental Impact Assessment Report (EIAR) was submitted
for the construction of extensions to the front and sides of the existing building and all associated site development works. Revised by Significant Further Information which consists of: Additional existing temporary structures have been included on the revised Site Layout Plan
for the installation of a 200kWp of ground mounted solar photovoltaic (PV) panels and all associated ancillary works