Ballymore West, Ventry, Co. Kerry
Proposed development
Demolition of the existing dwelling and construction of a replacement two-storey detached dwelling, the installation of a new on-site wastewater treatment system and associated infiltration area, together with all associated site works
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 7 Jan 2027
Timeline
Application received
4 Nov 2026
Last day for public submissions (est.)
Tue 8 Dec 2026
Decision due
7 Jan 2027
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
proposed elevational changes to existing dwelling consisting of proposed elevational changes to existing dwelling consisting of proposed enlarged window to rear elevation and enlarged opening for corner window sliding patio door to front elevation of dwellinghouse all in lieu of existing windows all with associated works located
(A) RENOVATE EXISTING DWELLING, (B) TO BUILD A PRIVATE TWO STOREY EXTENSION AT FRONT, SIDE AND REAR OF EXISTING DWELLING, (C) DECOMMISSION EXISTING SEPTIC TANK AND INSTALL A NEW TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
(A) RETAIN AS CONSTRUCTED DWELLING HOUSE WITHIN REVISED SITE BOUNDARIES AND (B) PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK AND INSTALL NEW SEPTIC TANK SYSTEM ADN ASSOCIATED SITE WORKS
CONSTRUCT A GARAGE/SHED AT THE REAR OF THE PROPERTY INCLUDING ALL NECESSARY SITE WORKS
(A) RETAIN AN EXISTING DWELLING HOUSE, AS CONSTRUCTED, WITHIN REVISED SITE BOUNDARIES AND (B)PLANNING PERMISSIN TO (i) CONSTRUCT A SINGLE STOREY SIDE EXTENSION; (ii) ADD 2 NUMBER ROOF LIGHTS AND MAKE MINOR ELEVATIONAL CHANGES CONSISTING OF WINDOW AND DOOR OPENING ALTERATIONS AND (iii) MAKE INTERNAL FLOOR PLAN REVISIONS ALL ABOVE TO THE AFOREMENTIONED DWELLING HOUSE, ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS ALL
RETAIN AN AS CONSTRUCTED DWELLING HOUSE SERVED BY A SEPTIC TANK AND PERCOLATION AREA AND A TIMBER GARDEN SHED AND TIMBER DECKING AREA TO REAR OF GARDEN