BALLYMORE WEST, DINGLE, CO KERRY
Proposed development
(A) RETAIN AN EXISTING DWELLING HOUSE, AS CONSTRUCTED, WITHIN REVISED SITE BOUNDARIES AND (B)PLANNING PERMISSIN TO (i) CONSTRUCT A SINGLE STOREY SIDE EXTENSION; (ii) ADD 2 NUMBER ROOF LIGHTS AND MAKE MINOR ELEVATIONAL CHANGES CONSISTING OF WINDOW AND DOOR OPENING ALTERATIONS AND (iii) MAKE INTERNAL FLOOR PLAN REVISIONS ALL ABOVE TO THE AFOREMENTIONED DWELLING HOUSE, ALSO TO INCLUDE ALL ASSOCIATED SITE WORKS ALL
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 13 Dec 2020
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
7 Sept 2020
Council asked for further information
29 Oct 2020
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
16 Nov 2020
Decision due
13 Dec 2020
Decision: conditional
11 Dec 2020
Grant issued
21 Jan 2021
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
demolition of the existing dwelling and construction of a replacement two-storey detached dwelling, the installation of a new on-site wastewater treatment system and associated infiltration area, together with all associated site works
proposed elevational changes to existing dwelling consisting of proposed elevational changes to existing dwelling consisting of proposed enlarged window to rear elevation and enlarged opening for corner window sliding patio door to front elevation of dwellinghouse all in lieu of existing windows all with associated works located
(A) RENOVATE EXISTING DWELLING, (B) TO BUILD A PRIVATE TWO STOREY EXTENSION AT FRONT, SIDE AND REAR OF EXISTING DWELLING, (C) DECOMMISSION EXISTING SEPTIC TANK AND INSTALL A NEW TERTIARY TREATMENT SYSTEM AND INFILTRATION/TREATMENT SYSTEM AND ALL ASSOCIATED SITE WORKS
(A) RETAIN AS CONSTRUCTED DWELLING HOUSE WITHIN REVISED SITE BOUNDARIES AND (B) PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK AND INSTALL NEW SEPTIC TANK SYSTEM ADN ASSOCIATED SITE WORKS
CONSTRUCT A GARAGE/SHED AT THE REAR OF THE PROPERTY INCLUDING ALL NECESSARY SITE WORKS
RETAIN AN AS CONSTRUCTED DWELLING HOUSE SERVED BY A SEPTIC TANK AND PERCOLATION AREA AND A TIMBER GARDEN SHED AND TIMBER DECKING AREA TO REAR OF GARDEN