Dunloe Upper, Beaufort, Co. Kerry
Proposed development
PERMISSION TO CONSTRUCT A HOUSE WITH DESIGN ALTERATIONS TO THAT ALREADY GRANTED BY WAY OF PRN 24/60043 WITH WASTEWATER TREATMENT SYSTEM AND POLISHING FILTER AT DUNLOE UPPER, BEAUFORT, CO. KERRY.
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 7 May 2025
- Residential units
- 1
- Floor area
- 1 m²
Timeline
Application received
13 Mar 2025
Decision due
7 May 2025
Decision: conditional
7 May 2025
Grant issued
10 Jun 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Retention permission to (A) retain extensions and elevational changes to existing house as constructed, (B) full planning permission to construct a new wastewater treatment unit and sand polishing filter along with all associated site works, (C) retain garage as constructed for use as domestic garage and (D) retention permission to retain all developments within revised site boundaries
1. Demolish part of existing dwelling at the rear. 2 Build new extensions to the rear and front of existing house. 3 Construct a new roof.
to retain (a) the rear extensions to the as-built dwelling house, (b) detached domestic sheds A, B, & C, (c) and all existing on-site development within revised site boundaries (previously granted under planning Reg. no. 300/72 and planning permission to decommission existing effluent treatment system and install a new septic tank and ANUA puraflow module system overlaying a soil polishing filter
Permission to construct 1 nr farm machinery shed, all in accordance with plans and particulars submitted
Retain existing shed as constructed
Retention permission to (A) retain existing B&B as constructed, (B) full planning permission for a change of use of domestic garage to private residence, (C) full planning permission to integrate private residence with existing B&B via a new link corridor, (D) full planning permission to construct a new wastewater treatment unit and sand polishing filter along with all associated site works and (E) Retention permission to retain all developments within revised site boundaries