Kerries East, Tralee, Co. Kerry
Proposed development
Retention permission to retain existing dwelling as built on site, retain existing garage and clothes drying lean-to as built on site, retain existing gazebo as built on site, retain the relocation of the treatment unit and percolation area from the north to the south of the site and the relocation of the front entrance from the west to the east side of the site complete with all ancillary site works associated with same within revised site boundaries on our site and Planning Permission to decommission the existing wastewater treatment system and install a new wastewater treatment unit and sandcel filter
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 1 Oct 2025
Timeline
Application received
7 Mar 2025
Council asked for further information
30 Apr 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
11 Jul 2025
Decision due
1 Oct 2025
Decision: conditional
1 Oct 2025
Grant issued
4 Nov 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Retention permission to retain the flat roof extension at the west side of the dwelling house, and the raised roof height over the garage at the rear of the house
The development will consist of a new raised pitched roof to replace existing, new dormer window and related extension at first floor and lower ground floor, alterations to elevations and associated site works to an existing single and two-storey detached dwelling.
Full planning permission for the construction of a single storey dwelling house, detached domestic garage and new vehicular site entrance. Permission is further sought for the installation of a mechanical wastewater treatment unit, with soil polishing filter and all ancillary site works on behalf of Anna Walsh & Brian Morrissey, on their site at Kerries East, Tralee, Co. Kerry. This planning application may be inspected or purchased at a fee not exceeding the reasonable cost of making a copy, at the offices of the Planning Authority during its public opening hours and that a submission or observation in relation to the application may be made to the Planning Authority in writing on payment of the prescribed fee within the period of 5 weeks beginning on the date of receipt by the Authority of the application.
A. Construct a storey and a half dwelling which will be served by a mechanical treatment unit and soil polishing filter and all necessary ancillary site works. B. Construct a domestic garage C. create new farm access gate to west of proposed dwelling.
(A) DEMOLISH EXISTING REAR EXTENSION, GARAGE AND OUTBUILDINGS, (B) CONSTRUCT A NEW FRONT PORCH ONTO EXISTING HOUSE, (C) CONSTRUCT REAR/SIDE EXTENSIONS ONTO THE EXISTING DWELLING HOUSE, (D) ELEVATION CHANGES AND INTERNAL ALTERATIONS TO EXISTING HOUSE, (E) CONSTRUCT A DETACHED GARAGE, (F) DE-COMMISSION THE EXISTING SEPTIC TANK ON SITE AND INSTALL MECHANICAL TREATMENT SYSTEM AND RAISED SOIL POLISHING FILTER AND ALL ASSOCIATED SITE WORKS
(A) PROVISION OF AN MV SUBSTATION BUILDING (C.60SQ.M, 4.6M HIGH) AND AN MV MODULAR STRUCTURE ( C. 12SQ.M, 3.4 M HIGH) BOTH BEING WITHIN A FENCED COMPOUND WITHIN THE "CONSENTED BALLYENAGHTY SOLAR FARM" (B) A C. 2.3KM 10KV UNDERGROUND CABLE INSTALLATION BETWEEN THE " CONSENTED BALLYENAGHTY SOLAR FARM AND THE EXISTING ESB BALLYRICKARD 38KV SUBSTATION VIA THE KERRIES ROAD AND SPA ROAD AND (C) ALL OTHER ANCILLARY WORKS. PLANNING PERMISSION IS SOUGHT FOR A DURATION OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED WITH THE APPLICATION