BALLYENAGHTY KERRIES EAST LOHERCANNOR, FARRANSTEPHEN KNOCKANACUIG BALLYVELLY, TRALEE
Proposed development
(A) PROVISION OF AN MV SUBSTATION BUILDING (C.60SQ.M, 4.6M HIGH) AND AN MV MODULAR STRUCTURE ( C. 12SQ.M, 3.4 M HIGH) BOTH BEING WITHIN A FENCED COMPOUND WITHIN THE "CONSENTED BALLYENAGHTY SOLAR FARM" (B) A C. 2.3KM 10KV UNDERGROUND CABLE INSTALLATION BETWEEN THE " CONSENTED BALLYENAGHTY SOLAR FARM AND THE EXISTING ESB BALLYRICKARD 38KV SUBSTATION VIA THE KERRIES ROAD AND SPA ROAD AND (C) ALL OTHER ANCILLARY WORKS. PLANNING PERMISSION IS SOUGHT FOR A DURATION OF 10 YEARS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED WITH THE APPLICATION
- Applicant
- Not published
- Authority
- Kerry County Council
- Decision due
- 12 Jun 2023
Timeline
Application received
18 Apr 2023
Decision due
12 Jun 2023
Decision: conditional
12 Jun 2023
Grant issued
14 Jul 2023
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
(A) construct 2 no. Industrial /general commercial buildings, each consisting of 2 no. units (4 units in total) (B) construct an extension onto the existing mart complex building which will be used as 6 individual storage units, and all associated ancillary works.
Retention permission to retain the flat roof extension at the west side of the dwelling house, and the raised roof height over the garage at the rear of the house
Retention permission to retain existing dwelling as built on site, retain existing garage and clothes drying lean-to as built on site, retain existing gazebo as built on site, retain the relocation of the treatment unit and percolation area from the north to the south of the site and the relocation of the front entrance from the west to the east side of the site complete with all ancillary site works associated with same within revised site boundaries on our site and Planning Permission to decommission the existing wastewater treatment system and install a new wastewater treatment unit and sandcel filter
Retention Permission to retain (A) a domestic shed/store/home gym and (B) the raised ground around the building (retaining wall, yard and concrete floor) as well as all associated works
Construct a single storey extension to the side of existing dwelling house, and all ancillary site works
The development will consist of a new raised pitched roof to replace existing, new dormer window and related extension at first floor and lower ground floor, alterations to elevations and associated site works to an existing single and two-storey detached dwelling.