Inis Oirr, 1 Baile Na Gleanna, Inisheer Island
Proposed development
For the erection of a 12m telecommunications structure with 2no. receiving dish, dual bay cabinet, concrete post and chain link fence and access gate, fibre chamber, concrete plinth and trunking cover for duct exit and cable run up pole. The development is required to carry the broadband data from the new high speed fibre broadband network on the island to the mainland by radiolink to connect to the NBI national fibre network as part of the government's national broadband plant to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 10 Jun 2025
Timeline
Application received
21 Feb 2025
Council asked for further information
15 Apr 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
14 May 2025
Decision due
10 Jun 2025
Decision: conditional
4 Jun 2025
Appeal lodged (ACP-322862-25)
Not available
Site location with nearby applications
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
the replacement of an existing 10.5 metre telecommunications support structure with attached equipment with a proposed new 15 metre lattice tower support structure carrying equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new equipment cabinets, and all associated site works including temporary construction access
chun teach cónaithe agus córas séarachais, chomh maith le gach obair eile a bhaineann leis an fhorbairt a thógáil. Tá mé ag cuir Ráiteas Tionchair Nádurtha faoi bhráid Chomhairle Chontae na Gaillimhe, maidir leis an t-iarratas pleanála seo
for a new dwelling house, sewage treatment plant and percolation area along with all ancillary works
for a new dwelling house, sewage treatment plant and percolation area along with all ancillary works
for the erection of a 15 m telecommunications structure supporting 4 no. receiving dishes, dual bay cabinet on concrete foundation, palisade fence with access gate, concrete plinth, white stone compound ground finish, and all ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island to the mainland by radio link to connect to the NBI national fibre network as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application
for demolition of an existing stone and rubble cottage, the construction of a replacement dwelling in the same location, and the installation of a replacement waste water treatment system and polishing filter, and all associated site works