Inis Oírr, Co na Gaillimhe
Proposed development
Chun teach cónaithe agus córas séarachais, chomh maith le gach obair eile a bhaineann leis an fhorbairt a thógáil. Tá mé ag cuir Ráiteas Tionchair Nádurtha faoi bhráid Chomhairle Chontae na Gaillimhe, maidir leis an t-iarratas pleanála seo
- Applicant
- Not published
- Authority
- Galway County Council
- Decision due
- 17 Jun 2026
- Residential units
- 1
- Floor area
- 188 m²
Timeline
Application received
23 Apr 2026
Decision due
17 Jun 2026
Decision: refused
9 Jun 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
for construction of proposed ball wall and associated works
the replacement of an existing 10.5 metre telecommunications support structure with attached equipment with a proposed new 15 metre lattice tower support structure carrying equipment transferred from the existing structure and the addition of new telecommunications antennas, dishes and associated equipment, together with new equipment cabinets, and all associated site works including temporary construction access
for a new dwelling house, sewage treatment plant and percolation area along with all ancillary works
for a new dwelling house, sewage treatment plant and percolation area along with all ancillary works
for the erection of a 15 m telecommunications structure supporting 4 no. receiving dishes, dual bay cabinet on concrete foundation, palisade fence with access gate, concrete plinth, white stone compound ground finish, and all ancillary development works. The development is required to carry the broadband data from the new high speed fibre broadband network on the island to the mainland by radio link to connect to the NBI national fibre network as part of the government’s national broadband plan to provide high speed broadband to all parts of the country that are not available commercially, including the islands, at the same data speed. A Natura Impact Statement (NIS) has been prepared and submitted in support of this planning application
for demolition of an existing stone and rubble cottage, the construction of a replacement dwelling in the same location, and the installation of a replacement waste water treatment system and polishing filter, and all associated site works