BAYS 3-7, DRUMNAHOAGH, LETTERKENNY
Proposed development
AMENDMENTS TO THE DEVELOPMENT PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 23/51928 INCLUDING: (1) SUBDIVISION OF THE EXISTING SINGLE WORKSHOP UNIT (APPROX. 1159M2) INTO TWO SEPARATE UNITS – UNIT 2A (APPROX. 332.2M2) AND 2B (APPROX. 816.1M2), (2) CHANGE OF USE OF THE NEW UNIT 2B FROM LIGHT INDUSTRIAL WORKSHOP USE TO A BUILDERS’ MERCHANT / TRADE COUNTER DEPOT WITH ANCILLARY WAREHOUSE, SHOWROOM / DISPLAY, OFFICE AND STAFF FACILITIES AND (3) ALL NECESSARY SITE AND ASSOCIATED DEVELOPMENT WORKS, INCLUDING REDUCTION IN SIZE OF A PREVIOUSLY PERMITTED MEZZANINE FLOOR AREA (APPROX. 815M2) TO APPROX. 223.6M2 AND INTERNAL STAIR ACCESS, MINOR MODIFICATIONS TO PREVIOUSLY PERMITTED ELEVATIONS BY OMITTING ONE ROLLER SHUTTER DOOR TO SOUTH-EAST ELEVATION, INTRODUCTION OF NEW ROLLER SHUTTER DOORS AND FIRE ESCAPE DOORS TO SOUTH-WEST AND NORTH-EAST ELEVATION, RELOCATION AND INCREASE IN SIZE OF REMAINING PERMITTED ROLLER SHUTTER DOORS, A NEW CUSTOMER ENTRANCE WITH ASSOCIATED SIGNAGE BEHIND THE PERMITTED ROLLER SHUTTER DOORS, OMISSION OF 1 NO. FIRE DOOR AND EXTERNAL SIGNAGE AND ASSOCIATED LIGHTING
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 7 Jan 2027
Timeline
Application received
4 Nov 2026
Last day for public submissions (est.)
Tue 8 Dec 2026
Decision due
7 Jan 2027
Site location with nearby applications
Affected by this development?
Anyone can make a submission. It takes about 10 minutes, the council must consider it, and it preserves your right of appeal. The council charges €20 per submission.
Tell your neighbours
Each household's own submission counts. Share this application so neighbours can object before the deadline.
Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
INSTALLATION OF HIGH-POWER ELECTRIC VEHICLE CHARGING POINTS AND ASSOCIATED INFRASTRUCTURE CONSISTING OF THE FOLLOWING: (1) INSTALLATION OF 8 NO. ELECTRIC VEHICLE CHARGING BAYS WITH 8 NO. TESLA ILLUMINATED CHARGING UNITS AND ASSOCIATED SIGNAGE, (2) INSTALLATION OF PROPOSED TESLA SUPERCHARGER POWER CABINET EQUIPMENT, (3) INSTALLATION OF PROPOSED MODULAR SUBSTATION, (4) ERECTION OF ASSOCIATED EV SIGNAGE AND (5) ALL ASSOCIATED SITE DEVELOPMENT WORKS INCLUDING SURFACING, LIGHTING AND LINE MARKING
ALTERATIONS AND EXTENSIONS TO SIDE AND REAR ELEVATIONS AND PERMISSION FOR CONSTRUCTION OF AN EXTENSION TO THE FRONT ELEVATION AND ASSOCIATED SITE DEVELOPMENT WORKS
REPLACEMENT OF 2 NO. OBSOLETE UNDERGROUND TANKS WITH 2 NO. 2000 LITRE OVERGROUND BUNDED STORAGE TANKS, USED TO STORE KEROSENE AND MARKED GAS OIL
CONSTRUCTION OF A STORAGE UNIT WITH ALL OTHER ASSOCIATED SITE WORKS
ERECTION OF AN EXTENSION TO EXISTING HOUSE AND INSTALLATION OF NEW SEPTIC TANK AND PERCOLATION AREA TO SERVE DWELLING HOUSE
COMMERCIAL STORAGE UNITS AND SALES YARD WITH SIGNAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS