BUNNAGEE, LETTERKENNY, CO. DONEGAL
Proposed development
CONSTRUCTION OF A STORAGE UNIT WITH ALL OTHER ASSOCIATED SITE WORKS
- Applicant
- Not published
- Authority
- Donegal County Council
- Decision due
- 24 Apr 2026
Timeline
Application received
2 Jul 2025
Council asked for further information
21 Aug 2025
Further information received. If the council treats it as significant, a new submission period opens (check the council's file)
10 Feb 2026
Decision due
24 Apr 2026
Decision: conditional
24 Apr 2026
Grant issued
27 May 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
AMENDMENTS TO THE DEVELOPMENT PREVIOUSLY PERMITTED UNDER PLANNING REF. NO. 23/51928 INCLUDING: (1) SUBDIVISION OF THE EXISTING SINGLE WORKSHOP UNIT (APPROX. 1159M2) INTO TWO SEPARATE UNITS – UNIT 2A (APPROX. 332.2M2) AND 2B (APPROX. 816.1M2), (2) CHANGE OF USE OF THE NEW UNIT 2B FROM LIGHT INDUSTRIAL WORKSHOP USE TO A BUILDERS’ MERCHANT / TRADE COUNTER DEPOT WITH ANCILLARY WAREHOUSE, SHOWROOM / DISPLAY, OFFICE AND STAFF FACILITIES AND (3) ALL NECESSARY SITE AND ASSOCIATED DEVELOPMENT WORKS, INCLUDING REDUCTION IN SIZE OF A PREVIOUSLY PERMITTED MEZZANINE FLOOR AREA (APPROX. 815M2) TO APPROX. 223.6M2 AND INTERNAL STAIR ACCESS, MINOR MODIFICATIONS TO PREVIOUSLY PERMITTED ELEVATIONS BY OMITTING ONE ROLLER SHUTTER DOOR TO SOUTH-EAST ELEVATION, INTRODUCTION OF NEW ROLLER SHUTTER DOORS AND FIRE ESCAPE DOORS TO SOUTH-WEST AND NORTH-EAST ELEVATION, RELOCATION AND INCREASE IN SIZE OF REMAINING PERMITTED ROLLER SHUTTER DOORS, A NEW CUSTOMER ENTRANCE WITH ASSOCIATED SIGNAGE BEHIND THE PERMITTED ROLLER SHUTTER DOORS, OMISSION OF 1 NO. FIRE DOOR AND EXTERNAL SIGNAGE AND ASSOCIATED LIGHTING
ALTERATIONS AND EXTENSIONS TO SIDE AND REAR ELEVATIONS AND PERMISSION FOR CONSTRUCTION OF AN EXTENSION TO THE FRONT ELEVATION AND ASSOCIATED SITE DEVELOPMENT WORKS
(1) DEMOLITION OF EXISTING TWO-STOREY HOUSE DUE TO DEFECTIVE MICA BLOCKWORK, (2) CONSTRUCTION OF (A) NEW TWO-STOREY REPLACEMENT DWELLING AND (B) DETACHED DOMESTIC GARAGE, (3) DECOMMISSIONING OF EXISTING SEPTIC TANK AND PERCOLATION AREA AND PROVISION OF A NEW EFFLUENT TREATMENT SYSTEM/PERCOLATION AREA TO THE SOUTH OF THE PROPOSED HOUSE AND (4) PROVISION OF A SOAKAWAY SURFACE WATER SYSTEM AND ALL ASSOCIATED SITE WORKS RELATING TO THE ITEMS ABOVE INCLUDING DEFINED BOUNDARY TREATMENT
COMMERCIAL STORAGE UNITS AND SALES YARD WITH SIGNAGE INCLUDING ALL OTHER ASSOCIATED SITE DEVELOPMENT WORKS
REPURPOSING AN EXISTING WORKSHOP TO FORM A NEW APPRENTICESHIP FACILITY, ALONGSIDE ASSOCIATED SITE WORKS