Application received
18 Dec 2024
Decision due
Not available
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
COMPLETION OF A 38KV GRID CONNECTION REQUIRED TO CONNECT THE PERMITTED DERRYKILLEW WIND FARM TO THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION INCLUDING THE FOLLOWING DEVELOPMENT WORKS: (1) CONSTRUCTION AND INSTALLATION OF A PERMANENT C13.2M HIGH 63D LINE-CABLE INTERFACE MAST LOCATED ON THE SOUTHERN EMBANKMENT OF THE RIVER ERNE, (2) CONSTRUCTION OF APPROXIMATELY 41M OF ACCESS TRACK INCLUDING TURNING AREA FROM THE EXISTING PAVED AREA TO THE BASE OF THE MAST, (3) COMPLETION OF A 130M LONG 38KV OVERHEAD LINE CROSSING OF THE RIVER ERNE, COMPRISING OF AN APPROXIMATELY 88M SECTION OF OVERHEAD LINE PROPOSED AS PART OF THE PROPOSED GRID DEVELOPMENT, EXTENDING FROM THE PERMITTED LINE-CABLE INTERFACE POINT ON THE NORTHERN EMBANKMENT (GRANTED UNDER PLANNING REF. NO. 23/50892) TO THE PROPOSED LINE-CABLE INTERFACE MAST ON THE SOUTHERN EMBANKMENT, (4) CONSTRUCTION AND INSTALLATION OF A PERMANENT C270M SECTION OF 38KV UNDERGROUND GRID CONNECTION CABLING FROM THE PROPOSED SOUTHERN LINE-CABLE INTERFACE MAST TO THE EXISTING CATHALEEN’S FALL 110KV SUBSTATION, (5) TEMPORARY MAST LAYDOWN AND ASSEMBLY AREA, (6) TEMPORARY CRANE HARDSTANDING/PAD AND (7) ALL ASSOCIATED EXCAVATION, FOUNDATIONS, DRAINAGE, AND REINSTATEMENT AND ANCILLARY SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ADDENDUM ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)
CONSTRUCTION OF EXTENSION TO EXISTING DWELLING
(1) DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND (2) REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS
ERECTION OF 2 ASSISTED LIVING HOUSES WITH NEW CONNECTION TO PUBLIC SEWER, STORM AND WATERMAINS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS
ERECTION OF 6 NO. DWELLING HOUSES, CONNECTION TO PUBLIC SEWER AND STORM SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS (PLANNING REF. NO. 24/60206 REFERS)