ObjectRight
Back to search
2462110Awaiting decisionretention

BALLYHANNA, BALLYSHANNON, DONEGAL PO

Not open for objections: The council has marked this application invalid or closed.

Proposed development

(1) CAR SALES COMMERCIAL YARD AND (2) STORAGE YARD, BOUNDARY WALLS AND LIGHTING AND PERMISSION FOR (1) CONTINUOUS USE AS CAR SALES COMMERCIAL YARD AS PREVIOUSLY GRANTED UNDER PLANNING REF. NO. 16/51387 AND (2) ERECTION OF A SINGLE STOREY CAR DISPLAY/SHOWROOM

Applicant
Not published
Authority
Donegal County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    18 Dec 2024

  2. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The council has marked this application invalid or closed.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2662031Open · 25 days left

COMPLETION OF A 38KV GRID CONNECTION REQUIRED TO CONNECT THE PERMITTED DERRYKILLEW WIND FARM TO THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION INCLUDING THE FOLLOWING DEVELOPMENT WORKS: (1) CONSTRUCTION AND INSTALLATION OF A PERMANENT C13.2M HIGH 63D LINE-CABLE INTERFACE MAST LOCATED ON THE SOUTHERN EMBANKMENT OF THE RIVER ERNE, (2) CONSTRUCTION OF APPROXIMATELY 41M OF ACCESS TRACK INCLUDING TURNING AREA FROM THE EXISTING PAVED AREA TO THE BASE OF THE MAST, (3) COMPLETION OF A 130M LONG 38KV OVERHEAD LINE CROSSING OF THE RIVER ERNE, COMPRISING OF AN APPROXIMATELY 88M SECTION OF OVERHEAD LINE PROPOSED AS PART OF THE PROPOSED GRID DEVELOPMENT, EXTENDING FROM THE PERMITTED LINE-CABLE INTERFACE POINT ON THE NORTHERN EMBANKMENT (GRANTED UNDER PLANNING REF. NO. 23/50892) TO THE PROPOSED LINE-CABLE INTERFACE MAST ON THE SOUTHERN EMBANKMENT, (4) CONSTRUCTION AND INSTALLATION OF A PERMANENT C270M SECTION OF 38KV UNDERGROUND GRID CONNECTION CABLING FROM THE PROPOSED SOUTHERN LINE-CABLE INTERFACE MAST TO THE EXISTING CATHALEEN’S FALL 110KV SUBSTATION, (5) TEMPORARY MAST LAYDOWN AND ASSEMBLY AREA, (6) TEMPORARY CRANE HARDSTANDING/PAD AND (7) ALL ASSOCIATED EXCAVATION, FOUNDATIONS, DRAINAGE, AND REINSTATEMENT AND ANCILLARY SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ADDENDUM ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

TOWNPARKS & BALLYHANNA, BALLYSHANNON, DONEGAL PO Donegal County Council Received 4 Nov 2026
2661819Awaiting decision

CONSTRUCTION OF EXTENSION TO EXISTING DWELLING

NO. 7 ESB HOUSES, STATION RD., BALLYSHANNON DONEGAL PO Donegal County Council Received 1 Oct 2026
2661437Refused

(1) DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND (2) REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS

EAST PORT, BALLYSHANNON, CO. DONEGAL Donegal County Council Received 30 Jul 2026
2561713Granted

ERECTION OF 2 ASSISTED LIVING HOUSES WITH NEW CONNECTION TO PUBLIC SEWER, STORM AND WATERMAINS AND ALL ASSOCIATED SITE DEVELOPMENT WORKS

TOWNPARKS, BALLYSHANNON, DONEGAL PO Donegal County Council Received 2 Oct 2025
2561180Refused

DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS

EAST PORT, BALLYSHANNON, DONEGAL PO Donegal County Council Received 9 Jul 2025
2561066Granted

ERECTION OF 6 NO. DWELLING HOUSES, CONNECTION TO PUBLIC SEWER AND STORM SYSTEM AND ALL ASSOCIATED SITE DEVELOPMENT WORKS (PLANNING REF. NO. 24/60206 REFERS)

BALLYHANNA, BALLYSHANNON, DONEGAL PO Donegal County Council Received 25 Jun 2025