2561180Refusedretention

EAST PORT, BALLYSHANNON, DONEGAL PO

Not open for objections: The council has already decided this application.

Proposed development

DEMOLITION OF EXISTING ACCOMMODATION UNIT WITH ADJACENT STORAGE AND REPLACEMENT ACCOMMODATION UNIT AND ALL ASSOCIATED SITEWORKS

Applicant
Not published
Authority
Donegal County Council
Decision due
2 Sept 2025
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    9 Jul 2025

  2. Decision due

    2 Sept 2025

  3. Decision: refused

    21 Aug 2025

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2662031Open · 25 days left

COMPLETION OF A 38KV GRID CONNECTION REQUIRED TO CONNECT THE PERMITTED DERRYKILLEW WIND FARM TO THE EXISTING CATHALEEN'S FALL 110KV SUBSTATION INCLUDING THE FOLLOWING DEVELOPMENT WORKS: (1) CONSTRUCTION AND INSTALLATION OF A PERMANENT C13.2M HIGH 63D LINE-CABLE INTERFACE MAST LOCATED ON THE SOUTHERN EMBANKMENT OF THE RIVER ERNE, (2) CONSTRUCTION OF APPROXIMATELY 41M OF ACCESS TRACK INCLUDING TURNING AREA FROM THE EXISTING PAVED AREA TO THE BASE OF THE MAST, (3) COMPLETION OF A 130M LONG 38KV OVERHEAD LINE CROSSING OF THE RIVER ERNE, COMPRISING OF AN APPROXIMATELY 88M SECTION OF OVERHEAD LINE PROPOSED AS PART OF THE PROPOSED GRID DEVELOPMENT, EXTENDING FROM THE PERMITTED LINE-CABLE INTERFACE POINT ON THE NORTHERN EMBANKMENT (GRANTED UNDER PLANNING REF. NO. 23/50892) TO THE PROPOSED LINE-CABLE INTERFACE MAST ON THE SOUTHERN EMBANKMENT, (4) CONSTRUCTION AND INSTALLATION OF A PERMANENT C270M SECTION OF 38KV UNDERGROUND GRID CONNECTION CABLING FROM THE PROPOSED SOUTHERN LINE-CABLE INTERFACE MAST TO THE EXISTING CATHALEEN’S FALL 110KV SUBSTATION, (5) TEMPORARY MAST LAYDOWN AND ASSEMBLY AREA, (6) TEMPORARY CRANE HARDSTANDING/PAD AND (7) ALL ASSOCIATED EXCAVATION, FOUNDATIONS, DRAINAGE, AND REINSTATEMENT AND ANCILLARY SITE DEVELOPMENT WORKS. AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) ADDENDUM ACCOMPANIES THIS APPLICATION. THE DEVELOPMENT IS COVERED BY THE PROVISIONS OF THE (RED III) RENEWABLE ENERGY DIRECTIVE III (DIRECTIVE (EU) 2023/2413)

TOWNPARKS & BALLYHANNA, BALLYSHANNON, DONEGAL PO Donegal County Council Received 4 Nov 2026
2661996Open · 19 days left

CHANGE OF CONDITION NO. 7 OF PLANNING PERMISSION REF. NO. 26/60677 TO PERMIT THE OPENING HOURS FOR THE PRE-SCHOOL / PLAYSCHOOL FACILITY FROM 8AM TO 6PM MONDAY TO FRIDAY

GAELSCOIL ÉIRNE, PARKVIEW & TOWNPARKS, BALLYSHANNON Donegal County Council Received 29 Oct 2026
2661849Awaiting decision

CONSTRUCTION OF AN EXTENSION TO THE REAR

39 TIRCONNAILL ST., BALLYSHANNON, DONEGAL PO Donegal County Council Received 7 Oct 2026
2661819Awaiting decision

CONSTRUCTION OF EXTENSION TO EXISTING DWELLING

NO. 7 ESB HOUSES, STATION RD., BALLYSHANNON DONEGAL PO Donegal County Council Received 1 Oct 2026
2661750Awaiting decision

(1) CHANGE-OF-USE FROM EXISTING OFFICES TO 3 NO. APARTMENTS AT GROUND FLOOR LEVEL, INCLUDING DEMOLITION OF THE EXISTING REAR EXTENSION AND CONSTRUCTION OF A REPLACEMENT EXTENSION TO ACCOMMODATE THE APARTMENTS, (2) CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO 2 NO. APARTMENTS AT FIRST FLOOR LEVEL, (3) CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO 2 NO. APARTMENTS AT SECOND FLOOR LEVEL, (4) DEMOLITION OF EXISTING FIRST-FLOOR BATHROOM AND CONSTRUCTION OF A REPLACEMENT EXTENSION AT FIRST AND SECOND-FLOOR LEVELS TO ACCOMMODATE THE ACCESS STAIRWELL TO APARTMENTS ON THESE FLOORS AND (5) CONSTRUCTION OF ACCESS STEPS FROM STREET LEVEL TO THE STORAGE BASEMENT AND ALL ASSOCIATED SITE WORKS

CASTLE STREET, BALLYSHANNON, DONEGAL PO Donegal County Council Received 21 Sept 2026
2661706Granted

CHANGE-OF-USE FROM RESIDENTIAL ACCOMMODATION TO BOOKMAKERS OFFICE AND ALL ASSOCIATED SITEWORKS

MARKET STREET, BALLYSHANNON, DONEGAL PO Donegal County Council Received 15 Sept 2026