25/6845Awaiting decisionpermission

Mishells, Bandon, Co. Cork

Not open for objections: The 5-week submission period has ended.

Proposed development

The provision of a Battery Energy Storage System (BESS), compound and cable route on a site of c. 4.61ha. The BESS compound will accommodate self-contained Lithium Iron Phosphate batteries within 32 no. BESS units, 8 no. MV Switchgear units, and a 38kV substation including a control room of 126m2. A cable route of c. 2km is proposed to run south from the compound to the L2033 and east along the L2033 to the nearby Bandon 110kV Substation. The proposed development includes for all associated development, site levelling, boundary treatments, security fencing, site access works, ducting and cabling and all ancillary works.

Applicant
Not published
Authority
Cork County Council
Decision due
Not available
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    17 Dec 2025

  2. Last day for public submissions (est.)

    Thu 29 Jan 2026

  3. Decision due

    Not available

Loading map…

Site location with nearby applications

Can't object to this one

The 5-week submission period has ended.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

25/5967Granted

Permission for change of design of works to existing dwelling to comprise construction of part single storey extension, part two-storey extension and modifications to said dwelling, as granted under permission reg. number 23/06445, and all associated site works.

Mishells, Bandon, Co. Cork, P72C448 Cork County Council Received 19 Sept 2025
23/6445Granted

Permission for works to existing dwelling to comprise construction of part single storey extension, part two-storey extension, modification to said dwelling, a detached garage, a waste water treatment system, vehicular entrance, field entrance, demolition of existing outhouse structures and all associated site works.

Mishells Bandon Co Cork Cork County Council Received 8 Dec 2023
22/5234Granted

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co Cork Cork County Council Received 30 May 2022
22/4890Awaiting decision

2km of grid connection infrastructure on the public road and agricultural land to connect the approved Finnis Solar Farm (Planning Reference 17/6111) to the existing Bandon Substation and to connect two parcels of land within the consented development comprising the laying of underground electricity cables, associated infrastructure and horizontal directional drilling.

Finnis Mishells Bandon Co. Cork Cork County Council Received 20 Apr 2022
19/4288Refused

Construction of dwelling, and to carry out associated site works which includes installation of foul water effluent treatment plant

Mishells Bandon Co. Cork Cork County Council Received 11 Feb 2019
18/5342Refused

Construction of a dwelling and to carry out associated site works, including the installation of foul water effluent treatment plant

Mishells Bandon Co. Cork Cork County Council Received 24 May 2018