Moorepark Technology Moorepark West Fermoy Co.Cork
Proposed development
Permission for the construction of a new dry storage building and permission for retention for an existing canopy. The development will consist of the construction of a single-storey steel framed building (107m2) with a ridge height of 4.78m above ground level and associated site works and permission for retention of an existing mono-pitch canopy (78m2) constructed adjoining an existing building and over an existing bund area with a ridge height of 7.54m above the existing ground level.
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 14 Apr 2025
Timeline
Application received
17 Feb 2025
Decision due
14 Apr 2025
Site location with nearby applications
Can't object to this one
The council has marked this application invalid or closed.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Planning Permission for the construction of a closed loop integrated constructed wetland and all associated ancillary works.
Permission for the construction of a new dry storage building and for permission of retention for an existing canopy. The development will consist of the construction of a single-storey steel framed building (107m2) with a ridge height of 4.78m above ground level and associated site works and permission for retention of an existing mono-pitch canopy (78m2) constructed adjoining an existing building and over an existing bund area with a ridge height of 7.54m above the existing ground level.
Permission for construction of a modular calf agricultural building and all associated site works on our site
Permission for A high-power electric vehicle charging hub and associated infrastructure consisting of the following: 1) installation of 10 no. electric vehicle charging with 5 no. associated charging units to replace 12 no. existing car parking spaces, 2) installation of a new canopy above EV charging spaces with internally illuminated signage, 3) new EV banner sign, 4) relocation of existing lighting columns and electrical cabinet, 5) installation of a new ESB substation and 6) all other associated site development, landscaping, road tie in and surface water drainage works
Permission for a high power electric vehicle charging hub and associated infrastructure consisting of the following: (i) conversion of 10no. existing parking spaces to electric vehicle charging bays, with 5no. associated charging units, (ii) installation of a new canopy above EV charging spaces with internal illuminated signage, (iii) new EV banner sign, (iv) installation of a new ESB substation and (v) all other associated site development, road tie in and surface water drainage works.
Permission for the construction of a high-power electric vehicle charging station consisting of 24 no. electric vehicle charging bays and all associated ancillary development including 2 no. electricity sub-stations, 24 no. power supply cabinets, pedestrian access, boundary treatments, landscaping and seating area at the Circle K service station. Vehicular access will be via the existing access and roundabout serving the existing Circle K motorway station. A Natura Impact Statement has been submitted to the planning authority with the application.