Moorepark Food Research Centre, Teagasc Shanacloon Fermoy Co.Cork
Proposed development
Permission for construction of a modular calf agricultural building and all associated site works on our site
- Applicant
- Not published
- Authority
- Cork County Council
- Decision due
- 1 Apr 2025
Timeline
Application received
5 Feb 2025
Decision due
1 Apr 2025
Decision: conditional
28 Mar 2025
Grant issued
2 May 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
Planning Permission for the construction of a closed loop integrated constructed wetland and all associated ancillary works.
Permission for the construction of a new dry storage building and for permission of retention for an existing canopy. The development will consist of the construction of a single-storey steel framed building (107m2) with a ridge height of 4.78m above ground level and associated site works and permission for retention of an existing mono-pitch canopy (78m2) constructed adjoining an existing building and over an existing bund area with a ridge height of 7.54m above the existing ground level.
Permission for the construction of a new dry storage building and permission for retention for an existing canopy. The development will consist of the construction of a single-storey steel framed building (107m2) with a ridge height of 4.78m above ground level and associated site works and permission for retention of an existing mono-pitch canopy (78m2) constructed adjoining an existing building and over an existing bund area with a ridge height of 7.54m above the existing ground level.
Permission for: a) Demolition of our existing single storey grasslands laboratory unit and adjoining agricultural buildings, b) Construction of a new two storey laboratory building with single storey office and storage facility, c) Construction of a new agricultural animal nutrition building, d) Construction of a new ESB substation, e) Undertake all associated ancillary accommodation and site works and construction of new carpark on our site.
Construction of agricultural Mill building and canopy link to existing building, all associated site works
The construction of a milking equipment farm storage building, inclusive of all necessary associated ancillary accommodation and site works.