Killeagy, Goonan, Co. Clare
Proposed development
To retain the continued use of an existing guyed wind monitoring mast, with instruments, 100m in height in the townland of Killeagy (Goonan), Co. Clare for a further periodof 2 years. The purpose of the mast is to take account of the most up to date meteorological data available for the site, to inform the consented wind energy development. Previous application references: 23/60441 and 24/60411(ClareCoco) ACP-318846-24 and ACP-321285-24 (An Coimisiún Pleanála)
This description looks cut short in the national planning register. Read the full description on the council's file
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 27 Aug 2026
Timeline
Application received
3 Jul 2026
Decision due
27 Aug 2026
Decision: conditional
27 Aug 2026
Grant issued
30 Sept 2026
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de
a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind turbines with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 No. permanent 38kV electrical substation including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank and all ancillary works, in the townland of Killeagy (Goonan), Co Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 No. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 No. existing site entrance off the L7080 ('The Gap Road') for the provision of construction and operational access; (viii) Provision of 3 No. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 No. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/roads, including the L7080, and the provision of new site access roads, 4 No. watercourse crossings, junctions and hardstand areas; (xi) 1 No. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 No. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 No. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year ope
for development which will consist of: 1. The erection of a temporary 100m high lattice type meteorological mast for a period of 5 years which will be fixed to ground anchors by stay wires and will include instruments for measuring local climate conditions and services. 2. The proposed works also include a hardstanding area and all ancillary works