Proposed development

For development which will consist of: 1. The erection of a temporary 100m high lattice type meteorological mast for a period of 5 years which will be fixed to ground anchors by stay wires and will include instruments for measuring local climate conditions and services. 2. The proposed works also include a hardstanding area and all ancillary works

Applicant
Not published
Authority
Clare County Council
Decision due
13 Dec 2023
Official file, drawings & documents on the council portal

Timeline

  1. Application received

    19 Oct 2023

  2. Decision due

    13 Dec 2023

  3. Decision: conditional

    12 Dec 2023

  4. Grant issued

    6 Jan 2025

  5. Appeal decided: modified (ABP-318846-24)

    3 Jan 2025

Loading map…

Site location with nearby applications

Can't object to this one

The council has already decided this application.

See applications open for objections →

Keep an eye on this area

We'll email you when new applications are lodged nearby.

Planning history within 750 m

2660434Granted

to retain the continued use of an existing guyed wind monitoring mast, with instruments, 100m in height in the townland of Killeagy (Goonan), Co. Clare for a further periodof 2 years. The purpose of the mast is to take account of the most up to date meteorological data available for the site, to inform the consented wind energy development. Previous application references: 23/60441 and 24/60411(ClareCoco) ACP-318846-24 and ACP-321285-24 (An Coimisiún Pleanála)

Killeagy, Goonan, Co. Clare Clare County Council Received 3 Jul 2026
2460411Granted on appeal

The development will consist of: (i) The construction of 7 no. wind turbines with the following parameters: a. Total tip height range of 179.5m – 180m, b. Rotor diameter range of 149m – 155m, c. Hub height range of 102.5m to 105m, (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 no. permanent 38kV electrical substation including a single-story control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank, and all ancillary works, in the townland of Killeagy (Goonan), Co. Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 no. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 no. existing site entrance off the L7080 (‘The Gap Road’) for the provision of construction and operational access; (viii) Provision of 3 no. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 no. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/ roads, including the L7080, and the provision of new site access roads, 4 no. watercourse crossings, junctions and hardstand areas; (xi) 1 no. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 no. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 no. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year operational life of the wind farm from the date of commissioning of the entire wind farm is sought. A Design Flexibility opinion issued by Clare County Council on 22nd April 2024 accomanies this application. The de

In the Townlands of Kilbane Killeagy (Ryan) Shannaknock, Killeagy (Stritch) Killeagy (Goonan) Ballymoloney, Magherareagh and Lackareagh Beg Co. Clare. Clare County Council Received 29 Aug 2024
2460394Awaiting decision

a ten-year planning permission for development at a site in the townlands of Kilbane, Killeagy (Ryan), Shannaknock, Killeagy (Stritch), Killeagy (Goonan), Ballymoloney, Magherareagh and Lackareagh Beg, Co Clare. The development will consist of: (i) The construction of 7 No. wind turbines with the following parameters: a. Total tip height range of 179.5m - 180m, b. Rotor diameter range of 149m - 155m, c. Hub height range of 102.5m to 105m; (ii) Construction of associated foundations, hardstand and assembly areas; (iii) All associated wind farm underground electrical and communications cabling connecting the turbines and mast to the proposed electrical substation; (iv) Construction of 1 No. permanent 38kV electrical substation including a single-storey control building with welfare facilities, all associated electrical plant and equipment, security fencing, entrance on to new access road, all associated internal underground cabling, drainage infrastructure, wastewater holding tank, retention separator tank and all ancillary works, in the townland of Killeagy (Goonan), Co Clare; (v) A Battery Energy Storage System within the 38kV electrical substation compound; (vi) 1 No. permanent meteorological mast of c. 36.5m in height, associated foundation and hard-standing area in the townland of Shannaknock; (vii) The permanent upgrade of 1 No. existing site entrance off the L7080 ('The Gap Road') for the provision of construction and operational access; (viii) Provision of 3 No. new permanent site entrances off the L7080 for the provision of construction and operational access; (ix) Provision of 3 No. new temporary site entrances off the L7080 for the provision of construction access; (x) Upgrade of existing tracks/roads, including the L7080, and the provision of new site access roads, 4 No. watercourse crossings, junctions and hardstand areas; (xi) 1 No. temporary construction compound with temporary offices and staff facilities in the townland of Killeagy (Goonan); (xii) 1 No. temporary storage area in the townland of Killeagy (Goonan); (xiii) 1 No. borrow pit in the townland of Killeagy (Goonan); (xiv) Peat and Spoil Management; (xv) Tree Felling to accommodate the construction and operation of the proposed development; (xvi) Operational stage site and amenity signage; and (xvii) All ancillary apparatus and site development works above and below ground, including soft and hard landscaping and drainage infrastructure. A 10-year planning permission and 35-year ope

Kilbane Killeagy (Ryan) Shannaknock Killeagy (Stritch), Killeagy (Goonan) Ballymoloney Magherareagh and Lackareagh Beg, Co. Clare. Clare County Council Received 21 Aug 2024