3 Atlantic View, Spanish Point, Miltown Malbay Co. Clare V95 CX62
Proposed development
For the construction of an extension to existing dwelling to comprise of utility & toilet (to replace existing), kitchen, playroom, wet room, relaxation room and garage with internal modifications to dwelling including ancillary site works
- Applicant
- Not published
- Authority
- Clare County Council
- Decision due
- 19 Jun 2025
Timeline
Application received
26 Feb 2025
Decision due
19 Jun 2025
Decision: conditional
12 Jun 2025
Grant issued
15 Jul 2025
Site location with nearby applications
Can't object to this one
The council has already decided this application.
See applications open for objections →Keep an eye on this area
We'll email you when new applications are lodged nearby.
Planning history within 750 m
to (a) alter, renovate and extend existing dwelling house (b) update existing wastewater treatment arrangement together with all associated site development works and services
for development of 1 no. primary wastewater pumping station at the Armada House and 1 no. secondary wastewater pumping station at the Armada Hotel, Spanish Point County Clare and for the development of a rising main wastewater pipe (c. 4.3kms in length) located within the public road carriageway (L6224, R482 and N67) in the townlands of Leagard South, Dough, Annagh, Caherrush, Emlagh and Quilty West, County Clare. The proposed development includes works within the curtilage of a protected structure, Armada House, formally Mother McCauley House (RPS No. 025) and works to the Bealaclugga Bridge which is a protected structure (RPS No. 185). The proposed development will consist of the following: 1. Provision of 1 no. primary wastewater pumping station at the Armada House, to service the existing Armada Hotel and the existing Armada House; 2. Provision of 1 no. secondary wastewater pumping station at the Armada Hotel, including 2 no. wastewater holding tanks; 3. Provision of a 110mm rising main pipe from the Armada Hotel to the Armada House (c. 240m in length), within the public road crossing the R482 and L6224; 4. Provision of 1 no. 110mm rising main pipe located within the public road (L6224, R482 and N67) from the proposed primary wastewater pumping station at the Armada House to the existing Irish Water foul sewer network at Quilty, which conveys flows to the existing Irish Water Kilmurry Ibrickane Wastewater Treatment Plant (Asset Number: D0536-02). The proposed rising main is c.4.3km in length and located entirely within the public road corridor; 5. Decommissioning and removal of 1 no. existing wastewater treatment plant, existing polishing filter, and existing percolation area at the Armada Hotel; 6. Decommissioning and removal of 1 no. existing wastewater treatment system and percolation area at the Armada House; 7. Provision of 1 no. temporary construction compound at the Armada House for the duration of the works; 8. All associated development and site enabling works and ancillary infrastructure including screening planting, scour valves, air valves,1 no. vent pipe, and 1 no. discharge manhole. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development
for development at Armada House, Leagard South, Spanish Point, Miltown Malbay, Co. Clare which is a protected structure (RPS No. 025). The works involve installing an external fire escape stairs in the internal courtyard, replacing two existing windows with two doors to allow for access onto the external stairs, a roller shutter over an existing window in the courtyard and to move the boiler house door to the side elevation along with associated site works
of the development which consists of: i) construction of bedroom extension to existing south facing gable, ii) provision of rooflights to wc & utility area, iii) change of elevational treatment to ancillary garden store/home office, as previously granted permission under planning reference 15/729, and all associated works
for development at this site at the Armada Hotel and Armada House (which is a protected structure, RPS No. 025), Spanish Point, Miltown Malbay, Co. Clare. The development will consist of – 1) The construction of an under-ground wastewater treatment plant including associated overground plant, 2) The construction of an under-ground pumping station, and 3) All associated site development works, including underground piping, landscaping and the decommissioning and removal of the existing wastewater treatment plant. This planning application is accompanied by a Natura Impact Statement (NIS)
to construct 3 no. detached houses with shared sewage treatment system, garages, open space and associated site works and services